Similar Projects
Z1LZ--FY20: Parking Area Sealing Re-Striping LCHCC
Post-Bid
Cape Coral, FL 33909

Annual Concrete Sidewalk, Driveway, Curb, and Gutter Repairs
Term Contract
Post-Bid
Fort Myers, FL 33901

Hancock Bridge Parkway Sidewalk Improvements - Northeast 16th Place to Southeast 24th Avenue
Results
Fort Myers, FL 33901

Hanson Street Sidewalk Improvements
Results
Fort Myers, FL 33901

West Terry Street Pathway Extension Project
Post-Bid
Bonita Springs, FL

Coral Oaks Main Parking Lot Resurfacing Project
Results
Cape Coral, FL 33915

Goodwin Street Pedestrian and Drainage Improvements
Post-Bid
Bonita Springs, FL

School Street and Bay Road Pedestrian Improvements
Results
Less than $75,000 est. value
Fort Myers Beach, FL

Ditches, Sidewalk, and Culvert Work (CDBG-DR)
Post-Bid
Fort Myers, FL

Bonair Towers Parking Lot Restoration and Paving
Results
Fort Myers, FL 33901

Ada Ramp and Mat Improvements - Fy21
Infrastructure
Post-Bid
Cape Coral, FL

Sidewalk/Drainage Improvements
Results
Less than $163,554 est. value
FL

Big John`s Parking Lot West End Modifications
Infrastructure
Post-Bid
Cape Coral, FL

Hancock Bridge Parkway Sidewalk Improvements (Moody Road to US41)
Results
Fort Myers, FL 33903

Mcgregor Boulevard Improvements Project
Infrastructure
Post-Bid
Fort Myers, FL 33990

Last Updated 08/02/2021 05:02 PM
Project Title

Skyline Boulevard Sidewalk Construction

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33909   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all labor, materials, equipment and operations necessary to complete the following work for the Skyline Boulevard Sidewalk project. The project consists of construction of a 5-foot wide sidewalk on the west side of Skyline Boulevard from SW 4th Street to Trafalgar Parkway

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents