Similar Projects
Oak & 19th Intersection Improvements - SIF147 - City of Bozeman
Alteration
Conception
$750,000 est. value
Bozeman, MT 59718

West Story Street- 4th to 8th Avenue - SCR27 - City of Bozeman
Infrastructure
Conception
$854,400 est. value
Bozeman, MT 59715

Madison Arm Road Improvements
Infrastructure
Bidding
$250,000 to $500,000 est. value
West Yellowstone, MT 59758

2022 Sewer Lining Project
Infrastructure
Post-Bid
Bozeman, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Fowler Connection (Babcock to Huffine) - Construction - SIF114 - City of Bozeman
Infrastructure
Conception
$3,000,000 est. value
Bozeman, MT

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Hudson Bay Divide South
Infrastructure
Results

Davis-fowler Interceptor (Durston Road to West Oak Street) - WWIF22 - City of Bozeman
Infrastructure
Conception
$1,250,000 est. value
Bozeman, MT

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Overlay and Chip Seal Madison Frontage Road and Two Dog Road Bozeman Area
Infrastructure
Results
Silver Star, MT 59751

Black Lot Improvements - P024 - City of Bozeman
Alteration
Conception
$410,000 est. value
Bozeman, MT 59715

Seal and Cover, Guardrail, Pavement Markings on the Three Forks
Infrastructure
Post-Bid
MT

Reported 07/15/2022 02:14 PM
Project Title

Bogert Place - Church to Story Street - SCR26 - City of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59715   (Gallatin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $402,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Bozeman, Montana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project. Reconstruction of bogert place from church street to story street, including repairs to failed curbs & gutters. The street is already in a failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is unsafe to maintain and keep open to public use. This project will provide a city standard street section, with ada compliant pedestrian ramps, pavement markings and signage which will improve pedestrian safety. Also, new asphalt and drainage improvements will eliminate potholes and minimize ice buildup. Ada compliance and ms4 permit compliance will be met at completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For planning purposes, project estimates utilize the most recent adjustments to local street reconstruction funding via a special improvement district assessment. This project is in included in the City of Bozeman FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents