Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Bidding
West Glacier, MT 59936

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Bidding
MT

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Post-Bid
Poplar, MT 59255

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Bidding
MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Overlay and Chip Seal SE of Fort Peck SE Wolf Point Area
Infrastructure
Bidding
Fort Peck, MT

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Post-Bid
MT

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Bidding
Great Falls, MT

Reported 12/08/2021 12:00 AM
Project Title

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area

Physical Address View project details and contacts
City, State (County) Belgrade, MT 59714   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

P1 Mobilization 1 LS - Lump Sum P2 Type 1 Chips 38,016 SY - Square YardQuantities are estimated P3 Liquid Emulsified Asphalt Grade CRS-2P (blended) 64 TN - TonQuantities are estimated P4 Liquid Emulsified Asphalt Grade CSS-1H (60:40 blend) 24 TN - TonQuantities are estimated P5 Traffic Control 1 LS - Lump Sum

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents