Similar Projects
Gulfstream Aerospace
New Construction - 202,000 SF
Conception
$55,000,000 est. value
Savannah, GA 31408

Airport Hangar Repair
Results
Camilla, GA 31730

PN 88410 Construct Aircraft Maintenance Hangar
- 717,000 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Savannah, GA

ADC Hanger
New Construction - 38,880 SF
Results
$10,000,000 to $25,000,000 est. value
Garden City, Savannah, GA 31408

Butler Municipal Airport T Hangars
Results
Butler, GA 31006

Repair Building 301 Hangar, Lawson Army Airfield (LAAF), Ft. Benning, Georgia
Design
$10,000,000 to $25,000,000 est. value
Fort Benning, GA

Norfolk Southern Corporate Airport Hangar
New Construction - 34,434 SF
Construction
$15,000,000 est. value
Atlanta, GA 30336

Louisville Municipal Airport – Conventional Hangar
New Construction - 66,420 SF
Results
Less than $800,000 est. value
Louisville, GA 30434

T-Hangar Site Preparation and Paving Phase 2
Bidding
Jasper, GA

Design/Build Hangar
Results
$140,000 est. value
Camilla, GA 31730

Hangars D & E Expansion
Results
$425,000 to $525,000 est. value
Adel, GA 31620

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Bidding
Albany, GA 31701

Airport T-Hangars
New Construction
Bidding
GA

Last Updated 12/28/2020 01:20 PM
Project Title

Moody AFB Personnel Recovery Hanger - W912HN20B3002

Physical Address View project details and contacts
City, State (County) Moody AFB, GA   (Lowndes County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a combined hangar/HMU facility and aircraft parts store. Work includes reinforced concrete foundation and floor slab, structural steel frame, standing seam metal roof, fire detection/protection, including high expansion foam system in the hangar bay area, utilities, landscaping, roads/parking, hangar apron-airfield access pavements, taxiway pavment, lighting and markings, communications support, and all other support as necessary. Work will include extension of installation roadways to accommodate new traffic pattern required around new apron-airfield access pavements, to include vehicle pavements, curb and gutter, marking, and lighting. Demolish existing parts store for 2,140 SM. Facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements, and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents