Similar Projects
Repair Building 301 Hangar, Lawson Army Airfield (LAAF), Ft. Benning, Georgia
Design
$10,000,000 to $25,000,000 est. value
Fort Benning, GA

Airfield Maintenance (MATOC Contract), North Carolina, South Carolina and Georgia
Design
$250,000 to $45,000,000 est. value
Savannah, GA

T-Hangar Site Preparation and Paving Phase 2
Bidding
Jasper, GA

T-Hangar Area - Hangar Building Construction
New Construction
Bidding
Woodbury, GA 30293

Improvements to the Airport
Post-Bid
Metter, GA

ABMS Maintenance/Logistics Facility, Robins AFB
New Construction - 227,000 SF
Post-Bid
$10,000,000 CJ est. value
Warner Robins, GA

Moody AFB Personnel Recovery Hanger - W912HN20B3002
Results
$25,000,000 to $100,000,000 est. value
Moody AFB, GA

South Security Checkpoint Expansion
Results
Atlanta, GA 30337

Downtown Atlanta Greyhound Intercity Bus Facility
New Construction - 14,000 SF
Construction
$8,500,000 est. value
Atlanta, GA 30303

Norfolk Southern Corporate Airport Hangar
New Construction - 34,434 SF
Construction
$15,000,000 est. value
Atlanta, GA 30336

Design-Build Services for an Airport Terminal Building and Area Improvements
Design
Hampton, GA 30228

Aircraft Hangar - Door/Roof Repairs
Renovation
Post-Bid
Savannah, GA

PN 88410 Construct Aircraft Maintenance Hangar
- 717,000 SF
Results
$25,000,000 to $100,000,000 est. value
Savannah, GA

Statesboro-Bulloch County Airport New Corporate Hangar
New Construction
Post-Bid
Statesboro, GA 30461

ADC Hanger
New Construction - 38,880 SF
Results
$10,000,000 to $25,000,000 est. value
Garden City, Savannah, GA 31408

Last Updated 06/07/2021 09:36 AM
Project Title

General Aviation Terminal and Hangar Complex Development

Physical Address View project details and contacts
City, State (County) Albany, GA 31701   (Dougherty County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar, Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

generally consists of two components: Schedule A – General Aviation Terminal and associated site work; and Schedule B – Corporate Hangar Complex and associated site work. The terminal building (Schedule A) is approximately 5,500 SF with site work including parking lot, access roads, site lighting, utilities, drainage improvements and fencing. The corporate hangar complex (Schedule B) is approximately 47,000 SF with site work that includes asphalt apron reconstruction, parking lot, access road, site lighting, utilities, drainage improvements and fencing.

Details

,, 52,500 SF - 1 Airline/Passenger Terminal, 5,500 SF New Construction, 1 Aircraft Hangar, 47,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents