Similar Projects
T-Hangar Site Preparation and Paving Phase 2
Bidding
Jasper, GA

Norfolk Southern Corporate Airport Hangar
New Construction - 34,434 SF
Construction
$15,000,000 est. value
Atlanta, GA 30336

Hangars D & E Expansion
Results
$425,000 to $525,000 est. value
Adel, GA 31620

Design/Build Hangar
Results
$140,000 est. value
Camilla, GA 31730

Repair Building 301 Hangar, Lawson Army Airfield (LAAF), Ft. Benning, Georgia
Design
$10,000,000 to $25,000,000 est. value
Fort Benning, GA

PN 88410 Construct Aircraft Maintenance Hangar
- 717,000 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Savannah, GA

Moody AFB Personnel Recovery Hanger - W912HN20B3002
Results
$25,000,000 to $100,000,000 est. value
Moody AFB, GA

Airport Hangar Repair
Results
Camilla, GA 31730

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Bidding
Albany, GA 31701

Butler Municipal Airport T Hangars
Results
Butler, GA 31006

Gulfstream Aerospace
New Construction - 202,000 SF
Conception
$55,000,000 est. value
Savannah, GA 31408

Airport T-Hangars
New Construction
Bidding
GA

Louisville Municipal Airport – Conventional Hangar
New Construction - 66,420 SF
Results
Less than $800,000 est. value
Louisville, GA 30434

Last Updated 01/04/2021 11:20 AM
Project Title

ADC Hanger

Physical Address View project details and contacts
City, State (County) Garden City, Savannah, GA 31408   (Chatham County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes 20,000 gross SF aircraft maintenance hangar high bay and approximately 18,878 gross SF of perimeter general purpose aircraft maintenance shops, supporting administrative spaces and telecommunications rooms. The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, high expansion foam and wet sprinkler fire suppression, fire detection, access control, direct digital control, utility management, intrusion detection, and fall protection systems. The hangar bay doors will be steel rolling doors with center leaf apertures. Roof construction will be standing seam metal roof. Both the roof and metal wall panel systems are custom specified to require all 20 year NDL warranty provisions to remain in full effect for (3 sec) peak gust wind speeds of 115 mph (ASCE 7-10). Load bearing and load transfer elements include structural steel framing and reinforced masonry construction. Site clearing within the footprint of the new facility includes the demolition of three facilities totaling 26,000 SF and will include asbestos and lead abatement. Supporting facilities include land clearing and grading, aircraft concrete pavements, asphalt pavements, underground tanks, fencing, general site improvements, and extension of underground utilities.

Details

Aircraft Hangar, 38,880 SF New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents