Similar Projects
Airport Hangar Repair
Results
Camilla, GA 31730

PN 88410 Construct Aircraft Maintenance Hangar
- 717,000 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Savannah, GA

Airport T-Hangars
New Construction
Bidding
GA

Hangars D & E Expansion
Results
$425,000 to $525,000 est. value
Adel, GA 31620

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Bidding
Albany, GA 31701

Gulfstream Aerospace
New Construction - 202,000 SF
Conception
$55,000,000 est. value
Savannah, GA 31408

ADC Hanger
New Construction - 38,880 SF
Results
$10,000,000 to $25,000,000 est. value
Garden City, Savannah, GA 31408

Repair Building 301 Hangar, Lawson Army Airfield (LAAF), Ft. Benning, Georgia
Design
$10,000,000 to $25,000,000 est. value
Fort Benning, GA

Moody AFB Personnel Recovery Hanger - W912HN20B3002
Results
$25,000,000 to $100,000,000 est. value
Moody AFB, GA

T-Hangar Site Preparation and Paving Phase 2
Bidding
Jasper, GA

Butler Municipal Airport T Hangars
Results
Butler, GA 31006

Norfolk Southern Corporate Airport Hangar
New Construction - 34,434 SF
Construction
$15,000,000 est. value
Atlanta, GA 30336

Louisville Municipal Airport – Conventional Hangar
New Construction - 66,420 SF
Results
Less than $800,000 est. value
Louisville, GA 30434

Last Updated 02/16/2021 10:16 AM
Project Title

Design/Build Hangar

Physical Address View project details and contacts
City, State (County) Camilla, GA 31730   (Mitchell County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction of an airplane hangar to be built at the Camilla-Mitchell County Airport, Camilla, Georgia Furnish and deliver one 85' (width) x 60' (length) x 19' (eave height) clear span enclosed steel building. There will also be a 24' (width) x 12' (Length) x 24'1" (eave height) enclosed steel building attached on one 85' end. The ridge line will be the same for both buildings so that the overall ridge line will be 72' long. There will be one 60' (width) x 18' (height) framed opening. One 14' (width) x 16' (height) 2500 series rollup door and one 12' (width) x 12' (height) 2500 series rollup. There will also be one 3070 man door. Both buildings will be insulated with a 3" R-10 VRR Insulation in the roof only. Gutter and downspouts will be required on both buildings along with 8' tall white linear panels around the inside of the 85'x60' with the following: Gabled Roof 2/12 Roof Pitch 3-20' Bay Spacings 1-12' Bay Spacings 26 Gauge PBR Galvalume Roof Panels 26 Gauge Color Trim 26 Gauge Color Gutter and downspouts Bolt Placement Drawings, Anchor Bolts Included Engineered Stamped metal building drawings Engineered Stamped foundation design for buildings (4" slab) Erection of buildings including all equipment needed Installation of slab

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents