Similar Projects
Airport Hangar Repair
Results
Camilla, GA 31730

Moody AFB Personnel Recovery Hanger - W912HN20B3002
Results
$25,000,000 to $100,000,000 est. value
Moody AFB, GA

PN 88410 Construct Aircraft Maintenance Hangar
- 717,000 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Savannah, GA

ADC Hanger
New Construction - 38,880 SF
Results
$10,000,000 to $25,000,000 est. value
Garden City, Savannah, GA 31408

Butler Municipal Airport T Hangars
Results
Butler, GA 31006

Repair Building 301 Hangar, Lawson Army Airfield (LAAF), Ft. Benning, Georgia
Design
$10,000,000 to $25,000,000 est. value
Fort Benning, GA

Norfolk Southern Corporate Airport Hangar
New Construction - 34,434 SF
Construction
$15,000,000 est. value
Atlanta, GA 30336

Louisville Municipal Airport – Conventional Hangar
New Construction - 66,420 SF
Results
Less than $800,000 est. value
Louisville, GA 30434

T-Hangar Site Preparation and Paving Phase 2
Bidding
Jasper, GA

Design/Build Hangar
Results
$140,000 est. value
Camilla, GA 31730

Hangars D & E Expansion
Results
$425,000 to $525,000 est. value
Adel, GA 31620

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Post-Bid
Albany, GA 31701

Airport T-Hangars
New Construction
Results
GA

ABMS Maintenance/Logistics Facility, Robins AFB
New Construction - 227,000 SF
Bidding
$10,000,000 CJ est. value
Warner Robins, GA

Reported 04/17/2021 12:00 AM
Project Title

Aircraft Hangar - Door/Roof Repairs

Physical Address View project details and contacts
City, State (County) Savannah, GA   (Chatham County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hangar Doors 1905 and 1923: Perform the bottom rolling hangar door inspection and repair - Remove Built-Up Roofing System in the 3 locations and replace with a 60 Mil, Single Ply TPO Roofing Membrane that is fully adhered. - All work shall be performed and completed to the highest standards and comply with all state and local building codes. - Maintain clean work areas at all times. Remove and dispose of all demolished materials and construction debris. Site must be cleaned every day at the completion of work. - All measurements and quantities supplied in this scope of work are approximate in nature and are supplied as a convenience for the Contractor. Contractor shall verify all new and existing conditions and dimensions at the job site. - Parking will be made available for the Subcontractor by the Owner and the Contractor shall coordinate all parking with the Owner prior to the beginning of work. - Owner reserves the right to retain all salvageable material. - Contractor shall coordinate inspections with the Owner as required. - Contractor is responsible for protection of all surfaces including those not in the scope of work from damage during construction up until final acceptance. - Final clean up and disposal: Remove debris, rubbish, and waste material from the property of the Owner on a daily basis. Upon completion of work, all construction areas shall be left clean and free from debris. - Clean all dust, dirt, stain, hand marks, paint spots, droppings and other blemishes.

Details

Aircraft Hangar, Renovation.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents