Similar Projects
Capital City Plaza - Phase II
New Construction - 550,000 SF
Conception
Atlanta, GA

Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

The Front Porch at Auburn Avenue
New Construction - 69,600 SF
Design
$18,000,000 est. value
Atlanta, GA 30312

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

RFQ Denmark Library - Forsyth County
New Construction, Infrastructure - 32,000 SF
Bidding
$11,900,000 CJ est. value
Alpharetta, GA 30004

Physical Activities Center Expansion Services
Addition, Demolition, Renovation, Infrastructure - 4,500 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

Krispy Kreme / Atlanta
New Construction, Infrastructure - 4,035 SF
Post-Bid
$1,400,000 CJ est. value
Atlanta, GA 30308

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

Stadium Red Lot Bus Only Lane
Results
Atlanta, GA 30315

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

City Lights Phase IIA
New Construction - 124,661 SF
Construction
$10,000,000 CJ est. value
Atlanta, GA 30301

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Demolition, Infrastructure, Renovation - 119,000 SF
Pending Verification
$40,000,000 CJ est. value
Atlanta, GA 30334

Trinity Central Flats
New Construction - 7,500 SF
Conception
Atlanta, GA 30303

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Last Updated 01/06/2023 02:08 PM
Project Title

Averly East Village Roswell / Holcomb Bridge Road Apartments

Physical Address View project details and contacts
City, State (County) Roswell, GA 30076   (Fulton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: the demolition of existing commercial structures and the construction of four multifamily buildings. As of January 6, 2023, the project began construction in September 2022 and is currently on-going. The existence of sub-contractor opportunities is not currently known.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents