Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Structures (Miscellaneous)
Infrastructure
Bidding
$72,913,665 CJ est. value
Altoona, IA 50009

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

South 35th and Grand Valley Culverts
Infrastructure
Results
IA 50265

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Shelter - City Of Des Moines
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Des Moines, IA 50309

Taxium 5th Mixed Use Development
New Construction, Infrastructure
Pending Verification
$6,500,000 CJ est. value
West Des Moines, IA 50265

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Last Updated 10/03/2022 01:05 PM
Project Title

Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs

Physical Address View project details and contacts
City, State (County) Johnston, IA 50131   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,511,941 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*Contract Award Date: Sep 30, 2022 Contract Award Number: W912EK22C0035 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: ON-TRACK CONSTRUCTION, LLC Contractor Awarded Address: Nevada, IA 50201 USA Base and All Options Value (Total Contract Value): $5511941.00 Base Bid - Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration. Option A - Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration. Option B - Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration. DES MOINES RIVER BASIN, SAYLORVILLE LAKE, POLK COUNTY, IA, BOB SHETLER, CHERRY GLEN AND PRAIRIE FLOWER, WATER AND SEWER REPAIRS SEE SECTION 01 11 00 SUMMARY OF WORK NAICS CODE: 237110 SIZE STANDARD: $39,500,000.00 ESTIMATED RANGE: BETWEEN $1,000,000.00 and $5,000,000.00 COMPLETION DAYS: 200 CONSECUTIVE CALENDAR DAYS ALL QUESTIONS SHALL BE SUBMITTED VIA PROJNET. SEE CLAUSE MVR.02 FOR ADDITIONAL INFORMATION. For this IFB Solicitation, the Rock Island District is requesting all electronic bids be submitted via email to the Contracting Officer and Contract Specialist. Contracting Officer - Mr. Nicholas M. Moore Contract Specialist - Mr. Bradley J. Grothus In the subject of the e-mail - the solicitation and Project Name shall be provided. The Contracting Officer or Contract Specialist will send an email acknowledging receipt. Please note, the Firewall can cause a delay in receipt of email, so be sure to allow time for the delay. The Bid Opening is currently scheduled for Monday, 29 August 2022 at 02:00 PM CST. The Contracting Officer and Contract Specialist will begin downloading bids ONE HOUR BEFORE BID OPENING TIME, which is the bid receipt cutoff time. All bids received after 01:00 PM CST on Monday, 29 August 2022 will be considered late. Audio Teleconference Bid Opening Information: Bid Opening will be held on Monday, 29 August 2022 at 02:00 PM CST. Please use the following call-in information to attend the meeting: Toll-Free: 1-844-800-2712 Access Code: 2760 598 3922 Following the conclusion of the bid opening, the Bid Abstract will be uploaded to SAM website under this solicitation, within 24 hours. Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on Amendment. Per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified Bonds need not be submitted at time of bid. HOWEVER, the Rock Island District reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity. The following deviation clauses now apply, in lieu of the corresponding FAR clauses: 52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized. 52.228-15, Performance and Payment Bonds--Construction (DEVIATION 2020-O0016), which removes the requirements for seals on Standard Forms. For any Questions please contact: Contracting Officer - Mr. Nicholas M. Moore Phone: 309-794-5250 Contracting Specialist - Mr. Bradley J. Grothus Phone: 309-794-5021 ALL SUBMITTED QUESTIONS FOR THIS PROJECT AND THE ANSWERS PROVIDED SHALL BE VIEWED IN BIDDER INQUIRY IN PROJNET AT (https://www.projnet.org). Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) August 15, 2022, 02:00 PM CDT. To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing. The Bidder Inquiry Key is: UW3FC3-8M3Y6J *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents