Similar Projects
Hombre Circle Culvert Improvements and Cleaning
Bidding
Panama City, FL 32407

Underdrains Installation and Repairs
Bidding
Less than $6,771,550 est. value
FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

10/1366DN EGLIN NON-POINT SOURCE PROJECT OKALOOSA / W
Post-Bid
Eglin AFB, FL

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

FDOT CIGP Orange Street Resurfacing and Drainage Improvements
Bidding
$1,720,000 est. value
Starke, FL 32091

Don Bishop Road Cross Drain Replacement
Post-Bid
FL

Seawall Repair
Results
Everglades, FL

Goodwin Street Pedestrian and Drainage Improvements
Bidding
Bonita Springs, FL

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Post-Bid
Less than $3,000,000 est. value
West Palm Beach, FL 33401

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

Oxford Drive Water Main and Drainage Improvements
Bidding
Bradenton, FL 34205

Drainage Improvements Gladeview Area Phase I-A and Phase II
Post-Bid
Less than $1,140,058 est. value
Miami, FL 33128

CDBG Repaving and Flood and Drainage Improvements
Results
Less than $566,054 est. value
Wildwood, FL 34785

Last Updated 03/27/2020 10:47 AM
Project Title

Emergency Dune Restoration

Physical Address View project details and contacts
City, State (County) FL   (Martin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Performing emergency dune restoration and other miscellaneous beach services. Bids shall include all costs for preparing the site for beach access and returning the site to pre­construction conditions including but not limited to, boardwalk removal and replacement and asphalt repairs. Three year contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents