Similar Projects
Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Conception
$5,000,000,000 CJ est. value
Social Circle, GA 30025

Spring Street Tank 10" Water Main Loop (Tank to CSX Bore on E Hightower) - City of Social Circle
Infrastructure
Conception
$350,000 CJ est. value
Social Circle, GA 30025

Treweeke Self-Storage
New Construction, Demolition, Infrastructure - 68,250 SF
Design
$10,000,000 est. value
Monroe, GA 30656

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Whataburger / Monroe
New Construction, Infrastructure - 3,746 SF
Bidding
$1,500,000 CJ est. value
Monroe, GA 30655

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Milling and Deep Patching
Results
Monroe, GA

FY 2020 CDBG Storm Drainage and Street Improvements
Infrastructure
Results
Monroe, GA

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

North Cherokee 12" Water Main Replacement (Ronthor to RR) - City of Social Circle
Infrastructure
Conception
$538,180 CJ est. value
Social Circle, GA 30025

Jacks Creek Landing
New Construction, Infrastructure
Design
$105,000,000 CJ est. value
Monroe, GA 30655

Last Updated 01/04/2023 10:31 PM
Project Title

Sycamore Street Parking Lot and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Social Circle, GA 30025   (Walton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $245,706 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 4, 2023. The project has been awarded with the amount of $245,706.25. Sealed bids will be received by the City of Social Circle for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of the Sycamore Street Parking Lot Improvements in the City of Social Circle, Georgia. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. All questions shall be submitted in writing only to Natalie Pifer at 861np@ppi.us, and to be given consideration, must be received by no later than 2:00 pm on Thursday, November 10, 2022. The Project consists of, but is not limited to the following major elements: Construction of proposed parking lots including the removal of the existing gravel, concrete sidewalk, and various trees. The new proposed parking lot will include grading and paving, installation of a storm drainage system along Sycamore Street, and associated improvements and erosion control measures. An Alternate Bid is requested for the complete asphalt resurfacing of Sycamore Street following construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents