Similar Projects
2022 Bond - Bellingham School District
New Construction, Renovation, Infrastructure
Conception
$122,000,000 CJ est. value
Bellingham, WA 98225

SR 539/Bay-Lyn Dr to International Boundary - Corridor Improvements
Infrastructure
Conception
$27,000,000 CJ est. value
Lynden, WA 98264

I-5/Squalicum Creek to SR 539 - Bridge Deck Overlays
Infrastructure, Renovation
Design
$989,000 CJ est. value
Bellingham, WA 98229

I-5/Slater Road Interchange - Improvements
Infrastructure
Design
$13,661,000 CJ est. value
Bellingham, WA 98229

Hundred Acre Wood Phase 1 RFQ
Infrastructure
Bidding
$1,000,000 CJ est. value
Bellingham, WA 98225

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Station 81 Site Preparation
Infrastructure
Post-Bid
Everson, WA 98247

Industrial Condensate Pipeline Outfall
Infrastructure
Results
$2,800,000 est. value
Lynden, WA

Lummi Island Breakwater Replacement
Infrastructure
Results
$1,800,000 to $2,200,000 est. value
WA

The Millworks Project Phase I
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Bellingham, WA 98225

Home Road Multifamily
New Construction, Infrastructure
Pending Verification
$36,000,000 CJ est. value
Bellingham, WA 98225

Bellingham Bay Community Boating Center
New Construction, Infrastructure - 1,236 SF
Pending Verification
$300,000 CJ est. value
Bellingham, WA 98225

Tromp Road - City of Lynden
Infrastructure
Conception
$1,000,000 CJ est. value
Lynden, WA 98264

Bay Road Corridor 2023 Stop Control
Infrastructure
Design
$50,000 CJ est. value
Glacier, WA 98244

RFP - Boardmill Redevelopment Opportunity
New Construction, Infrastructure - 44,000 SF
Post-Bid
$1,500,000 CJ est. value
Bellingham, WA 98225

Last Updated 04/24/2023 04:04 AM
Project Title

SR 542/Squalicum Creek to Bellingham Bay - Fish Passage

Physical Address View project details and contacts
City, State (County) Deming, WA 98244   (Whatcom County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,787,879 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Remove an existing 205 foot long, 6x6 foot concrete box culvert, wingwalls, slabs, and weir system, and install a new bridge with a minimum hydraulic opening width of 38 feet, and new streambed alignment enhancing the current stream channel, which was shifted east when the culvert installation replaced a historic bridge, traffic control and other work. Involves 122 items and 125 working days. Work class 1 or 6. This is a Federally funded contract with a 15% disadvantaged business enterprise goal. Estimated value $7,500,000 - $10,000,000 WSDOT - SR 542/Squalicum Creek to Bellingham Bay - Fish Passage *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents