Project Title | RFQ Engineering - SR 516 Lake Orange Expressway Segments 1 and 3 |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32801 (Orange County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 7, 2023, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Central Florida Expressway Authority (CFX) requires the services of Professional Engineering Consultants to prepare construction drawings / specifications providing for the construction of SR 516 from US 27 to SR 429. This new corridor four-lane limited access highway will be divided into three segments, with one segment extending from US 27 to west of Cook Road (Segment 1), one segment extending from west of Cook Road to the Lake County/Orange County Line (Segment 2), and one segment extending from the Lake County/Orange County Line to SR 429 (Segment 3). This procurement seeks design services for Segments 1 and 3. Segment 1 includes a four-lane limited access highway and interchange with US 27 and realignment of US 27 to accommodate the proposed interchange while avoiding impacts to Lake Louisa State Park. Segment 3 includes a four-lane limited access highway with auxiliary lanes between the Lake County/Orange County Line and SR 429, interchange ramps with Valencia Parkway, a systems interchange with SR 429, toll gantries for all interchange ramps (6), construction of a segment of Valencia Parkway between the interchange ramps and Schofield Road and bridges for the interchange ramps and main line over Valencia Parkway, interchange ramps, and SR 429. Additional elements include surveying, drainage evaluation and design, bridge and retaining wall design, permitting, intelligent transportation systems (ITS), lighting, signing and pavement markings, maintenance of traffic, right-of-way mapping utility design and coordination, geotechnical analysis, scheduling and project controls, progress reporting and other associated tasks and activities. The costs of this project will be announced at a future date. As of March 3, 2020 this project is seeking qualifications. Bidding for contractor or a firm timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |