Similar Projects
Last Updated | 10/03/2022 12:01 AM |
Project Title | Marauder Complex MC -1 |
Physical Address | View project details and contacts |
City, State (County) | Lancaster, CA 93536 (Los Angeles County) |
Category(s) | Commercial, Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | College/University, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. The project includes This project will consist of the installation of a pre-fabricated modular building. The College has a separate contract with SKC inorder to fabricate and set the building. Work of this contract will require coordination efforts with SKC. Please note that this project has commenced previously by another contractor but was unable to complete the project. Please refer to the list below which indicates the major scopes of work (please be advised that list does not include all work of this contract as the contract documents and the Work scope Special Conditions will need to be utilized as well). a. Grading (please note that the over excavation and recompaction for this building was completed and documented previously) and spoil removal b. Excavation, spoil removal and installation of permanent concrete foundations for the modular building. c. The underground infrastructure for the storm drain, sewer, domestic water, gas have be left within 5' of the building foot print. Once the building has been set then final connection to the building will be required. d. The underground conduit only infrastructure for the electrical (power. signal, fire alarm, etc.) has been left within 5' of the building foot print. Once the building has been set then final connection to the building will be required along with any and all conductors and wiring and final terminations. e. Site work concrete. f. Chain Link Fencing/Gates g. Irrigation and landscaping h. Site Lighting (conduit is complete conductors/cabling and terminations will be required) i. Interior Fire Alarm, Data, Signal, Security work utilizing exiting pathways to run conductors/cabling and make terminations. j. Interior IDF Closet k. Installation of a HVAC split system for MDF closet. l. Building Identification and room signage m. Lockers n. Interior specialty mats o. Final Cleaning Online Q&A Yes Q&A Deadline 10/14/2022 4:00 PM (PDT) 17029B, 306304.02 |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |