Similar Projects
Reported | 10/15/2021 12:00 AM |
Project Title | Building D 2nd Floor Labs Mechanical System Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Long Beach, CA 90808 (Los Angeles County) |
Category(s) | Education, Single Trades |
Sub-Category(s) | College/University, Electric, Mechanical, Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $600,000 |
Plans Available from | Copy Center - 09/03/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Brief Description of Work: Upgrade control valves and pneumatic valves, replace all supply and exhaust lab valves. Replace reheat coils, upgrade controls to DDC and integrate into existing building DDC system. Replace fume hood controls and sensors with new DDC controls. Convert labs from constant volume to variable volume system for energy savings, provide power to new DDC controls and lab valves where required. And minor ceiling repairs where lab valves are replaced. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |