Similar Projects
Local Telecommunication Services
Term Contract
Bidding
Los Angeles, CA 90245

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Surveillance System Maintenance
Alteration
Post-Bid
CA

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Furnish Control Panels for the City of Torrance Scada System
Infrastructure
Post-Bid
Torrance, CA

Upgrade of Smart Classroom Audio Visual (AV) Equipment in 28 Classrooms And 3 Conference Rooms
Alteration
Results
Pasadena, CA 91106

Exterior LED Lighting Project
Alteration
Post-Bid
Carson, CA 90747

Telecommunications Cabling
Term Contract, Alteration
Results
Less than $200,000 est. value
CA 90810

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Electrical System Repair Services
Alteration
Results
CA

Reported 11/20/2021 12:00 AM
Project Title

Conduit Infrastructure For Wi-Fi Expansion

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90081   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric, Security/Communications
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide contracted services to install new conduit from existing building communication rooms to existing light poles and to add new poles at Rail Divisions 11, 21 and 22 to support the Connected Facilities CP (Improve / expand Wi-Fi in yards & indoor). DBE/SBE/DVBE Goal & Percentage (1) SBE 21 % DBE/SBE/DVBE Goal & Percentage (3) DVBE 3 %

Details

Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents