Similar Projects
Electrical System Repair Services
Alteration
Post-Bid
CA

Electrical System Repair Services in Los Angeles ,Ventura ,and Kern Counties
Alteration
Post-Bid

Cast Iron Main Replacement
Infrastructure
Bidding
$2,745,430 est. value
Long Beach, CA 90899

Puente Hills Auto Center Pylon Sign Upgrade
Alteration
Bidding
$550,000 est. value
Industry, CA 91744

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Bidding
Whittier, CA 90603

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Bidding
$600,000 est. value
Long Beach, CA 90808

Orchard Dale Elementary School Modernization Project- Electrical/Low Voltage
Alteration
Bidding
Whittier, CA 90603

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Bidding
Torrance, CA 90504

Groundwater Pre-Filter and Carbon Filtration Removal and Replacement and Repair Services
Term Contract
Bidding
Paramount, South Gate, CA 90280

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

Electrical System Repair Services
Alteration
Post-Bid
CA

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Bidding
Los Angeles, CA 90081

Last Updated 09/21/2021 11:04 AM
Project Title

North Long Beach Collection Main Control Valve Upgrade

Physical Address View project details and contacts
City, State (County) Long Beach, CA 90899   (Los Angeles County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,116,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK: The Work shall include but not limited to all labor, equipment and materials necessary to complete the following work: Site 1: (Cherry Avenue) The Work shall include but not be limited to furnishing all labor, equipment and materials necessary to remove and dispose of existing sump pump and associated discharge piping, pressure transmitter and pressure sensing line, vault cover, electrical junction boxes and electrical conduit; install new pressure transmitter and sensing line, 2-inch hot tap of existing 24-inch water main; install new sump pump and associated discharge piping; install new electrical junction boxes, electrical wiring; install new RTU, meter pedestal, light fixture and electrical conduit, antenna pole and antenna; perform PLC programming, SCADA programming and system integration; perform two pipeline condition assessment inspections on the existing 24-inch water main with two different assessment technologies (both assessments will utilize a tethered tool as shown on the plans); and all other incidental work items, complete and operable. Site 2: (Wardlow Avenue) The Work shall include but not be limited to furnishing all labor, equipment and materials necessary to remove and dispose of existing meter box and steel lid, electric operator and vertical shaft, 16-inch cast iron piping and an owner-furnished 16-inch butterfly valve and actuator; remove 24-inch piping, meter pedestal and instrument container; install new concrete precast vault with steel ladder and double leaf hatch; install new 16-inch and 24-inch ductile iron piping and fittings and pressure gauges; install new 16-inch butterfly valve with electric actuator; install new air vent assembly with 8-inch vent piping; install new sump pump with 2-inch sump pump discharge piping; install new electrical junction boxes, electrical wiring; install new RTU, meter pedestal, light fixture and electrical conduit, antenna pole and antenna; perform PLC programming, SCADA programming and system integration; CCTV inspection; perform two condition assessment inspections on the existing 24-inch water main with two different assessment technologies (one assessment will utilize a SeeSnake tool and the other assessment will utilize an external acoustical tool); and all other incidental work items.

Details

Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents