Similar Projects
Billy Bowlegs Recreation Facility - City of Fort Myers
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Fort Myers, FL 33905

Kelly Road Multi-Residential Development
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Fort Myers, FL 33908

The Homes at 81 West
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Fort Myers, FL 33912

Skyline Boulevard Retail
New Construction, Infrastructure - 4,000 SF
Design
$1,000,000 CJ est. value
Cape Coral, FL 33914

RFP D/B - US 41 Over Caloosahatchee River Bridge #120002
Infrastructure
Bidding
$26,046,845 CJ est. value
Villas, FL 33907

North 1 Utilities Extension Project (UEP) Area 3
Infrastructure
Bidding
$269,000 CJ est. value
Cape Coral, FL 33904

Wawa #5237 / Fort Myers
New Construction, Infrastructure - 6,421 SF
Post-Bid
$1,400,000 CJ est. value
Fort Myers, FL 33912

Artificial Reef Construction 2022
Infrastructure
Post-Bid
$137,465 CJ est. value
Cape Coral, FL 33909

Performance Storm Water Pond Maintenance
Infrastructure
Results
FL

Powell Creek Bypass Canal Water Quality Improvement
New Construction, Infrastructure
Results
North Fort Myers, FL 33917

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Multi Commercial Development - Sitework
Infrastructure
Construction
Lehigh Acres, FL 33971

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

ADM-76 Nicholas/Country Club Repipe - City of Cape Coral
Infrastructure
Conception
$12,450,000 CJ est. value
Cape Coral, FL 33990

Last Updated 12/08/2022 02:04 PM
Project Title

Pine Lake Preserve Stormwater Management - City of Bonita Springs

Physical Address View project details and contacts
City, State (County) Bonita Springs, FL 34135   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $347,818 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Hydrological restoration project will re-hydrate critical wetland habitat and re-establish hydraulic connectivity between the Imperial River and the undisturbed CREW wetlands which lie to east of the preserve in the Corkscrew swamp. The project will redirect flows from a storm water ditch on the northern boundary of the property along East Terry Street, south onto the property, via the construction of berms and overland flow-ways. The water will be routed through two existing ponds and then into a dry Imperial River tributary. Additionally water from the Kehl canal will be redirected into the dry tributary. This Project will improve water quality, restore wetland habitat, and reduce flooding potential to existing surrounding neighborhoods. The City is required, by the Florida Department of Environmental Protection, to remove 9,903 lbs/yr of nitrogen from the freshwater watershed by the year 2027, through the Imperial River Basin Management Action Plan (BMAP). Construction of this project is designed to help achieve that nitrogen reduction. This project will improve water quality in the Imperial River and its receiving waters of Estero Bay by removing excess nitrogen that has been introduced into the ecosystem though the development of the land over the past century. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of December 8, 2022, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents