Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Oak & 19th Intersection Improvements - SIF147 - City of Bozeman
Alteration
Conception
$750,000 est. value
Bozeman, MT 59718

2022 North 7th Avenue Water Renovations
Infrastructure
Design
$427,000 CJ est. value
Bozeman, MT 59715

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

2023 Downtown Sewer Renovations
Infrastructure
Bidding
$1,120,000 CJ est. value
Bozeman, MT 59715

Gallatin County Courts Building - All Trades
Demolition, New Construction, Infrastructure - 65,000 SF
Sub-Bidding
$24,000,000 CJ est. value
Bozeman, MT 59715

Call for Art for Intersection Art Project
Term Contract
Sub-Bidding
Bozeman, MT 59715

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Milky Way Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Bozeman, MT 59718

East Gallatin Preserve Subdivision
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Bozeman, MT 59715

West Story Street- 4th to 8th Avenue - SCR27 - City of Bozeman
Infrastructure
Conception
$854,400 est. value
Bozeman, MT 59715

Last Updated 08/05/2022 08:33 AM
Project Title

Headwaters Trail System Crack Seal and Seal Coat - 2022

Physical Address View project details and contacts
City, State (County) Three Forks, MT 59752   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Three Forks is seeking proposals from qualified firms or individuals for construction of the Headwaters Trail System "Crack Seal and Seal Coat - 2022". The proposals will then be reviewed and a recommendation for award is scheduled for August 23rd, 2022, at 7:00 p.m. during the City Council meeting at 206 Main Street, Three Forks, Montana. The project for which the work under the service agreement may be whole or only a part is generally described as follows: Crack seal and seal coat approximately 11,000 lineal feet of existing eight-foot-wide asphalt trail located along Talc Road in the City of Three Forks. Work also includes removal and replacement, asphalt patching, and asphalt overlay operations. Questions can be directed to the project engineer, Ahren C. Hastings, P.E. TD&H Engineering, ahren.hastings@tdhengineering.com cell: 970.381.4358. CONTRACTORS and any of the CONTRACTORS' subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. CONTRACTOR is required to have registered with the DLI prior to bidding on this project in accordance with 39-9-102 of Montana Code. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. The Contractor is required to be an Equal Opportunity Employer. Prevailing wage rates are required.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents