Similar Projects
MCSTOPPP Full Trash Capture Device - 205.5 - City of San Rafael
New Construction, Infrastructure
Conception
$1,009,000 CJ est. value
San Rafael, CA 94901

Marin City Pond and Drainage Improvements - Zone 3 - Marin County
Infrastructure
Conception
$14,100,000 CJ est. value
San Rafael, CA 94901

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Haz-Mat Abatement and Demolition of Existing City Owned Building
Term Contract, Demolition, Infrastructure
Design
$213,200 CJ est. value
West Covina, CA 91791

Tree Mortality Program Project 42
Term Contract
Bidding
San Andreas, CA 95249

San Antonio Pump Station Motor Control Center Replacement and Seismic Retrofit
Renovation
Bidding
$7,000,000 CJ est. value
Sunol, CA 94586

Civic Center Well Abandonment and Lease Closure
Demolition, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Huntington Beach, CA 92648

Regional General Job Order Contracts
Term Contract
Sub-Bidding
Long Beach, CA 90802

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

RFQ - Professional Environmental Services - CEQA
Alteration
Post-Bid
Anaheim, CA

Asbestos Abatement
Alteration
Results
$40,000 est. value
Chico, CA 95928

Lead Abatement and Exterior Painting at Two School Sites
Alteration
Results
$50,000 est. value
El Segundo, CA

San Rafael High School Portable Removal Project
Demolition, Infrastructure
Construction
$196,598 CJ est. value
San Rafael, CA 94901

Headwaters Corner - Mountains Restoration Trust/TreePeople
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Calabasas, CA 91302

Fresno Chaffee Zoo Expansion/Addition Projects - City of Fresno
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fresno, CA 93728

Last Updated 09/15/2023 01:03 AM
Project Title

Edgerly Island Well Destruction at Napa/Sonoma Marshes Wildlife Area

Physical Address View project details and contacts
City, State (County) Napa, CA 94559   (Napa County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, tools, equipment, materials, incidentals, permits and taxes necessary to remove the existing sediment fill within the well, assess the well for possible obstruction, removal of obstruction (if warranted), well video survey, and installation of cement within the well structure for destruction of the well. Location of Services: Napa Sonoma Marshes Wildlife Area Edgerly Island, Milton Road, Napa, CA 94559. Estimated Cost: $ 70,000.00 Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 3%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 3% DVBE participation requirements. Refer to the Instructions to Bidders. Small Business Preference and Small Business Subcontractor participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a copy of your certification must be submitted with the bid proposal). As of March 1, 2015, Senate Bill 854 requires that No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations for projects greater than $25,000.00. Failure to register with DIR or list sub-contractors not registered will render your bid non-responsive. Contract Term Date: Upon DGS approval until June 29, 2024. For general questions pertaining to the bidding requirements, please contact Engineering at 916-539-4060. For Engineering questions, please contact Bryan Demucha at (916) 531-4716 or Email; Bryan.Demucha@wildlife.ca.gov. Construction shall be completed within THIRTY (30) WORKING DAYS following the official "Notice of Start Date" from the State to the Contractor to commence construction. Additional working days will be allowed for delays caused by unexpected changes including but not limited to supply chain or natural force. Contractor must advise Engineer IN WRITING of unexpected changes and obtain CDFW approval before any delays occur.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents