Similar Projects
Rehabilitation of the South Apron - AIR - 5 - City of Winter Haven
Infrastructure
Conception
$4,259,592 CJ est. value
Winter Haven, FL 33881

Rehabilitation of the South Apron - AIR - 5 - City of Winter Haven
Infrastructure
Conception
$4,259,592 CJ est. value
Winter Haven, FL 33881

The Works Business Resource Center
New Construction, Infrastructure - 17,000 SF
Design
$9,000,000 CJ est. value
Lakeland, FL 33815

The Works Business Resource Center
New Construction, Infrastructure - 17,000 SF
Design
$9,000,000 CJ est. value
Lakeland, FL 33815

RFP D/B - SR 35 (US 98) From N of West Socrum Loop Rd to S of CR 54
Infrastructure
Bidding
$110,916,000 CJ est. value
Lakeland, FL 33812

RFP D/B - SR 35 (US 98) From N of West Socrum Loop Rd to S of CR 54
Infrastructure
Bidding
$110,916,000 CJ est. value
Lakeland, FL 33812

Posner Business Center
New Construction, Infrastructure - 72,212 SF
Post-Bid
$5,650,000 CJ est. value
Davenport, FL 33837

Posner Business Center
New Construction, Infrastructure - 72,212 SF
Post-Bid
$5,650,000 CJ est. value
Davenport, FL 33837

Construction Services for Phase 3 Project Improvements
Renovation, Infrastructure
Results
FL

Construction Services for Phase 3 Project Improvements
Renovation, Infrastructure
Results
FL

Swan Lake Village
New Construction - 33,936 SF
Construction
$20,000,000 est. value
Lakeland, FL 33810

Plateau Village Housing
New Construction - 3,226 SF
Construction
Lakeland, FL 33815

Staybridge Suites Hotel / Winter Haven
New Construction, Infrastructure - 75,000 SF
Pending Verification
$22,600,000 CJ est. value
Winter Haven, FL 33880

Staybridge Suites Hotel / Winter Haven
New Construction, Infrastructure - 75,000 SF
Pending Verification
$22,600,000 CJ est. value
Winter Haven, FL 33880

Marigold Avenue Roundabouts - Osceola County
Infrastructure
Conception
$5,000,000 est. value
Poinciana, FL 34758

Last Updated 04/17/2023 05:08 PM
Project Title

Lake Wire Apartments

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33815   (Polk County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $12,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of one building on 0.82 acre. Scope details have not been finalized. As of April 17, 2023 the project is in design stage and seeking rezoning approval from the Lakeland City Commission. A meeting is scheduled for April 17, 2023. The architect has been chosen. Information regarding the general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but is not expected to begin before the first quarter of 2024.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents