Martin Luther King Jr. Boulevard Transit and Safety Improvements - City of Eugene
Infrastructure
Conception
$600,000 CJ est. value
Eugene, OR 97401

Martin Luther King Jr. Boulevard Transit and Safety Improvements - City of Eugene
Infrastructure
Conception
$600,000 CJ est. value
Eugene, OR 97401

28th Street: Main St to Olympic St (Springfield)
Infrastructure
Design
$1,716,000 est. value
Springfield, OR 97475

S. 28th Street Dust Mitigation (Springfield)
Infrastructure
Design
$1,289,156 CJ est. value
Springfield, OR 97477

High Street Protected Bikeway
Infrastructure
Bidding
$1,400,000 CJ est. value
Eugene, OR 97405

High Street Protected Bikeway
Infrastructure
Bidding
$1,400,000 CJ est. value
Eugene, OR 97405

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

Downtown Riverfront Southern Access and Parking
Infrastructure
Post-Bid
$2,300,000 to $2,700,000 est. value
Eugene, OR 97408

Thermal Storage Tank (TES)
Infrastructure
Results
$3,300,000 to $3,600,000 est. value
Eugene, OR 97408

Thermal Storage Tank Chilled Water Shutdown and Valve Installation Project
Infrastructure
Results
Eugene, OR 97408

YMCA / Eugene
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Eugene, OR 97405

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Microtel by Wyndham
New Construction, Infrastructure - 37,256 SF
Pending Verification
$12,000,000 CJ est. value
Florence, OR 97439

Lincoln Street Protected Bike Lanes - City of Eugene
Infrastructure
Conception
$1,288,000 CJ est. value
Eugene, OR 97401

Coburg Loop - N. Coburg Industrial Way
Infrastructure
Design
$499,877 CJ est. value
Fall Creek, OR 97438

Last Updated 02/10/2023 06:50 AM
Project Title

South Hills 3rd Level Storage Tank Replacement

Physical Address View project details and contacts
City, State (County) Springfield, OR 97477   (Lane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,123,024 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contemplated work consists of furnishing all labor, materials and equipment necessary for the construction of a new South Hills 3rd Level Storage Tank Replacement, two identical 0.58-milliongallon (MG) ground level welded steel potable water storage tanks of 67-foot interior diameter and 26-foot 3-inches shell height, including, but not limited to, the following items: Prestressed concrete storage tank demolition; Reinforced concrete foundation; Miscellaneous storage tank appurtenances; Interior and exterior storage tank protective coating systems; Gravel access road and site plaza; Storm and drainage piping and structures; Retaining walls. Fully buried utility vault with seismically actuated butterfly valves; Storage tank feed and drainage piping, including flexible expansion joints at the storage tank; Electrical and instrumentation and controls work. Special minimum experience qualifications apply to portions of this project. Tank Painting Contractors and Storage Tank Contractors who are not already listed as pre-qualified by the Engineer shall submit to the Engineer a Statement of Qualifications complying in form and content to the requirements of the bid documents. The minimum qualifications and submittal requirements are specified in the Contract documents. A Bidders Failure to Attend the Pre-bid Meeting Shall Cause Any Bid Submitted by That Bidder to Be Deemed Non-responsive and the Bid Will Be Returned Unopened. The options for sealed bid proposal packet delivery are as follows: 1) Mail in to the above address and recipient; or 2) Drop off at the above address during business hours and call the recipient at 541-726-2396 to make aware of the delivery. The results will also be posted to the SUB bidding website. The successful Bidder will be notified no sooner than Wednesday, October 5th by 4:00 PM. No proposal will be considered by the Springfield Utility Board unless the bidder agrees to comply with the provisions of ORS 279C.800 to 279C.870 and 40 U.S.C. 276(a) pertaining to prevailing wages, as applicable. Each bid must contain a statement as to whether or not the Bidder is a resident Bidder as defined in ORS 279A.120. Each bid must also contain a statement as to whether the Bidder is registered with the Oregon Construction Contractors Board. No bid will be received or considered unless the Bidder is registered with the Construction Contractors Board, as required by ORS 701.035.ET.SEQ. No bid will be considered unless the First-Tier Subcontractor Disclosure form is submitted by the specified deadline. Faxed copies will NOT be accepted. First-tier and other subcontractors must be accepted by Springfield Utility Board prior to the preconstruction meeting. Proposals must be submitted on the prescribed forms and must be accompanied by certified check, cashier's check, or bid bond executed in favor of Springfield Utility Board in an amount not less than 5 percent (5%) of the amount bid. The successful bidder will be required to furnish to Springfield Utility Board a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of $30,000, unless exempt under ORS 279C. PN - 2104-0001 Project awarded to----T. Bailey, Inc. ---5,123,024.00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents