Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Fire Detection and Suppression
Term Contract
Bidding
$305,746 est. value
Olympia, WA 98501

Fire Suppression and Testing
Alteration
Bidding
WA

Airport Fire Suppression System Services
Renovation, Alteration
Post-Bid
Everett, WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Water Meter Changeout
Infrastructure
Results
WA

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

STA Plaza Fire Sprinkler Head Replacement
Alteration
Bidding
$138,000 est. value
Spokane, WA 99201

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Westside WWT Backflow Prevention Improvement
Infrastructure
Bidding
Vancouver, WA 98660

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Building 2565 Sprinkler System Replacement
Alteration
Bidding
$261,250 to $288,750 est. value
Vancouver, WA 98660

Last Updated 12/14/2021 01:25 PM
Project Title

Design Build Services New Campus Fire Protection and Domestic Water Reservoir

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Fire Protection, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To providing progressive Design-Build services for a New Campus Fire Protection and Domestic Water Reservoir on the Pullman campus of Washington State University.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents