Similar Projects
Tolt Pipeline No 1 Rehabilitation
Infrastructure
Bidding
$3,100,000 est. value
Duvall, WA 98019

Station 50 - Waterline Extension
Infrastructure
Bidding
Arlington, WA 98223

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Water System Improvements
Infrastructure
Post-Bid
Kittitas, WA 98934

Sedgwick Road Watermain Relocation
Infrastructure
Bidding
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

164th Street SW Transmission Main Connection
Infrastructure
Post-Bid
$10,000,000 to $12,000,000 est. value
WA

Design Build Services New Campus Fire Protection and Domestic Water Reservoir
Infrastructure, Alteration
Bidding
Pullman, WA 99163

Water Meter Changeout
Infrastructure
Results
WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

WWTP Utility Water Building Improvements
New Construction, Alteration
Results
$250,000 to $300,000 est. value
Clarkston, WA 99403

Reported 10/20/2021 12:00 AM
Project Title

Reservoir Transmission Main Replacements

Physical Address View project details and contacts
City, State (County) Douglas, Wenatchee, WA (Chelan, Douglas Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the installation of approximately 2,000 ft of 12-inch ductile iron pipe, 1,000 ft of 16-inch ductile iron pipe, 2,000 ft of 20-inch fusion welded HDPE pipe, 2,000 ft of 22-inch fusion welded HDPE pipe pipe, and related valves, appurtenances, and connections to the existing systems.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents