Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

2021 Downtown Overlay and Utility Project COB Project
Infrastructure
Bidding
$1,800,000 to $2,000,000 est. value
Bothell, WA

Warm Beach Water System Water Replacement
Infrastructure
Bidding
$2,000,000 est. value
Stanwood, WA 98292

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Poplar Street - Colville to 5th
Infrastructure
Bidding
Walla Walla, WA 99362

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Redundant Feed to Squak Mountain Project
Infrastructure
Bidding
Issaquah, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Evergreen Apartment Water System Consolidation
Infrastructure
Bidding
$248,000 est. value
Onalaska, WA

Last Updated 01/31/2022 11:27 AM
Project Title

Tolt Pipeline No 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Duvall, WA 98019   (King County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of the following elements of Work: rehabilitation of approximately 2,500 linear feet of the Tolt Pipeline No. 1 using 54-inch HDPE pipe installed by slip-lining, making connections to existing 66-inch pipeline, installing blow off valves and chambers, installing access port and air release chamber, erosion control, traffic control, surface removals and restoration

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents