Similar Projects
RFP Design - Professional Services for Metropolitan Park Design
Infrastructure
Bidding
$300,000 CJ est. value
Jacksonville, FL 32202

RFQ - Architect-Engineer Design and Related Services at Various Locations Under the Cognizance of Naval Facilities Engineering Systems Command Southeast
Term Contract
Bidding
$45,000,000 CJ est. value
Jacksonville, FL 32212

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Professional Services for Architecture-Engineering Continuing Contracts Northeast Region
Term Contract
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFP Design - Westside Service Center Glove (WSSC) Lab and Administration Building Design Services
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Jacksonville, FL 32254

College-Wide 5-Year Master Plan
Term Contract
Post-Bid
Jacksonville, FL

Water Resources IDIQ Contracts
Results
Less than $10,000,000 est. value
Jacksonville, FL 32207

RFQ - Developer Partner
New Construction, Infrastructure
Bidding
$30,000 CJ est. value
Jacksonville, FL 32202

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Last Updated 02/15/2023 12:37 PM
Project Title

RFP Design - Blacks Ford WRF - Expansion from 6 to 12 MGD

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Proposal (RFP) is to select a Qualified Proposer to provide permitting, design, bid and post design engineering services to expand the Blacks Ford WRF from 6 to 12 MGD through a Construction Manager at Risk (CMAR) delivery method. The services include, but not limited to: influent screening, two new oxidization ditches, improve existing oxidation ditches, three new secondary clarifiers, cloth disk filters, UV system, plant drain (sewer) pump stations, digester, reject storage, biosolids management, chemical system, I&C, new electrical bldg., generator, fuel tank, yard piping. All Response documentation must reference the RFP Title and Number noted above. All Responses must be made on the appropriate forms as specified within the RFP and uploaded to a JEAs sourcing platform. Instructions for using JEAs sourcing platform can be found in Appendix C - Zycus Supplier Instructions. Responses are due by the time and on the date listed above. Late Responses may not be accepted. Respondents are strongly encouraged to acquire log in credentials early as possible. Additionally, Respondents are encouraged to submit bids early to ensure uploading process goes smoothly. Question Deadline 03/07/2023 For Questions: Buyer: Daniel Kruck E-mail: krucdr@jea.com

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents