Similar Projects
Last Updated | 06/23/2020 01:18 PM |
Project Title | Construction Management at Risk Services for Avalon and Meadowbrook Middle Schools Capital Renewal Project |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32828 (Orange County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To replace roofs on select buildings at two campuses, to include replacement of roofs on seven (7) buildings at Avalon Middle School, located at 13914 Mailer Blvd, Orlando, FL 32828, and replacement of roofs on seven (7) buildings at Meadowbrook Middle School, located at 6000 North L, Orlando, FL 32808. The combined estimated construction budget for both schools is $4,500,000. Avalon Middle School has eight (8) permanent buildings and Meadowbrook Middle School has eight (8) permanent buildings; Building 1 at both campuses is not part of this project. Goal:LDB 10% VBE:3% The general services outlined below will be performed: 1) Pre-Construction Phase Services shall include but are not limited to: attending any and all design and preconstruction conferences, assisting and cooperating with the Design Professional with respect to the design of the Project, reviewing and commenting on design documents, constructability review, advertising & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction schedule and incorporating design schedule into a single project schedule, refining general requirements and general conditions, and documenting "as-is" conditions (including offsite utilities from which connections are to be made). 2) Construction Phase Services include, but are not limited to, furnishing and paying for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely and fully perform and complete the construction of the entire Project in a good and workmanlike manner in accordance with the Construction Documents. The Construction Management team shall provide all necessary construction services to deliver to the owner a safe, finished, and fully functioning facility within the estimated construction budget. Target Schedule: a) Design/Pre-construction Services Commencement: JULY 2020 b) Construction Notice to Proceed: APRIL 2021 c) Substantial Completion: JULY 2021 |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |