Similar Projects
New Court Administrative Building
New Construction - 28,000 SF
Conception
$13,662,000 est. value
Graham, NC

Public Buildings Bond Projects
Renovation
Conception
$3,750,000 est. value
Monroe, NC

New Town Hall
New Construction - 9,000 SF
Design
Summerfield, NC

Judge East Maurice Braswell Courthouse Lower Level Bathroom Renovations
Renovation
Bidding
Fayetteville, NC 28301

Old Courthouse Renovations
Renovation
Bidding
$100,000 est. value
Greensboro, NC 27401

Restoration of the Existing Town Hall and Police Department Structure
Renovation - 7,202 SF
Post-Bid
North Topsail Beach, NC 28460

City Hall Improvements and Renovations
Renovation - 12,100 SF
Post-Bid
Siler City, NC 27344

Plaza Repair Project - Wake County Courthouse
Results
Raleigh, NC

Lincoln County Courthouse
Results
Lincolnton, NC 28092

Historic Union County Courthouse Restoration and Renovation - Phase 1
Renovation
Construction
Monroe, NC 28112

Cabarrus County Courthouse - GMP2 Package
Construction
Concord, NC 28025

Board Chambers Renovations
Renovation
Bidding
NC

Courthouse Repairs
Post-Bid
$100,000 to $250,000 est. value
Sparta, NC 28675

Wake County Courthouse 3RD Floor County Attorney`s Suite
Renovation
Results
Raleigh, NC 27600

Pender County Courthouse - Interior Renovations
Construction
Burgaw, NC 28425

Reported 03/30/2022 12:00 AM
Project Title

Hayes and Thompson Hall Accessible Toilet Renovations

Physical Address View project details and contacts
City, State (County) Wilkesboro, NC   (Wilkes County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of renovations to create four single occupancy accessible toilet rooms in Hayes and Thompson Halls – one on each floor of these two-story buildings for a total of four toilet rooms. The work consists of non-structural demolition, new metal stud and gypsum board partitions with tile floors and wainscots, painted gypsum board walls and lay-in acoustical tile ceilings. Each toilet room has one water closet and one lavatory to be connected to existing/extended plumbing systems. New LED lay-in light fixtures will be included in the electrical scope. The mechanical scope will include adjustments to existing ductwork to accommodate the new layouts and ceilings.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents