Similar Projects
New Town Hall
New Construction - 9,000 SF
Design
Summerfield, NC

Structural Repairs Mann Hall
Term Contract
Bidding
$5,000,000 est. value
Raleigh, NC 27607

Construction of the Moore County New Courthouse and Renovation
New Construction, Renovation
Bidding
Carthage, NC

Craven County Courthouse/EOC/IT Flood Remediation and Renovations
Renovation
Post-Bid
New Bern, NC

Rolesville Town Hall Renovation Project
Renovation
Post-Bid
Rolesville, NC 27571

Wake County Courthouse 10th Floor Renovations
Renovation
Results
Raleigh, NC 27601

Addition to Burke County Courthouse
Addition
Results
Morganton, NC

Davidson County Courthouse Addition and Renovation
Renovation, Addition - 87,400 SF
Construction
Less than $29,000,000 est. value
Lexington, NC 27292

Historic Union County Courthouse Restoration and Renovation - Phase 1
Renovation
Construction
Monroe, NC 28112

Edenton State Historic Site Visitor Center
Renovation
Bidding
Raleigh, NC

Alton Lennon Courthouse Disaster Relief Project
Post-Bid
$40,000,000 to $50,000,000 est. value
Wilmington, NC 28401

Design-Build of Princeville Town Hall Hazard Mitigation and Rehabilitation
Renovation - 6,000 SF
Results
Tarboro, NC

DCO Administration I Building Renovations
Renovation
Construction
Durham, NC 27701

Wake County Courthouse 3RD Floor County Attorney`s Suite
Renovation
Post-Bid
Raleigh, NC 27600

Improvements and Repairs Town Hall, Police Department and Recreation Facilities
Results
Less than $500,000 est. value
Cramerton, NC 28032

Reported 01/12/2021 09:38 AM
Project Title

Cabarrus County Courthouse – GMP2 Package

Physical Address View project details and contacts
City, State (County) Concord, NC 28025   (Cabarrus County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method
Project Status Construction Commenced January 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is a phased project made up of several bid packages and phases. GMP1 is currently underway and GMP1.5 (Foundations) is out to bid. This current package, GMP2 is for the construction of the new 240,000 SF Courthouse. The new courthouse consists of a 4-story building with mechanical penthouse. The new courthouse will tie into the existing courthouse. The existing courthouse will remain occupied during the construction of the new courthouse and once the new courthouse is completed, the existing courthouse will be renovated under a future GMP package 3. GMP 2 01A Continuous Clean-Up 09B Ceramic Tile 01B Final Cleanup 09C Acoustical Ceilings / Sound Absorptive Panels 01C Temp. Construction Fencing and Barricades 09D Resilient Flooring, Carpet, Base, & Accessories 01D General Trades 09E Terrazzo Flooring 03A Concrete Slabs and Misc. Concrete 09F Painting and Sealants 03B Precast Concrete Planks 10A Signage 04A Masonry 10B Div. 10 Specialties 05A Structural & Misc. Steel 11A Window Washing Systems 06A Architectural Millwork 12A Window Shades 07A Waterproofing / Caulking / Sealants 14A Elevators 07B Fluid Applied Air Barrier 21A Fire Protection 07C Metal & Wood Wall Panels 22A Plumbing 07D Precast Concrete Wall Panels 23A HVAC & Louvers 07E Roofing 23B Testing and Balancing 07F Spray Applied Fireproofing 22A & 23A Combo Plumbing and HVAC Bids 08A Doors, Frames, & Hardware 26A Electrical 08B Overhead Coiling Doors 27A Telecommunications 08C Detention Doors, Frames, & Hardware 32A Permanent Site Fencing 08D Glass & Glazing 32B Landscaping 08E Specialty Doors / Fire Doors 32C Sitework and Site Furnishings 09A Framing, Drywall, & Plaster

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents