Similar Projects
Douglass Crossroads/Knox Hill Road Improvements
Bidding
DeFuniak Springs, FL 32435

Eve Circle Roadway & Drainage Improvements
Bidding
De Funiak Springs, FL 32433

Washington Street Resurfacing and Stormwater Improvements
Post-Bid
Freeport, FL 32439

Superpave Asphalt Concrete
Post-Bid
FL

Sea Croft Drive Improvements
Results
De Funiak Springs, FL 32433

CR 883 Improvement Project
Results
Less than $1,526,499 est. value
De Funiak Springs, FL 32433

Washington County CR276A Clayton Road over Holmes Creek Bridge
Bidding
FL

Buckhorn Boulevard SCOP Paving
Post-Bid
FL

Southbound Right Turn Lane CR283
Results
Less than $355,130 est. value
De Funiak Springs, FL 32433

CR 276 Alford Road Paved Shoulders and Resurfacing Project
Bidding
FL

Hot Plant Bituminous Courses
Results
Less than $217,000 est. value
FL

FDOT District Three Headquarters Site Paving Southside
Bidding
Chipley, FL 32428

Resurfacing
Results
Less than $5,639,924 est. value

West Boulevard Roadway Improvements Project
Results
Chipley, FL

Safety Project/Milling and Resurfacing/Drainage Improvements
Results
Less than $2,569,909 est. value
FL

Last Updated 10/09/2020 11:43 AM
Project Title

Asphalt

Physical Address View project details and contacts
City, State (County) (Holmes, Walton, Washington Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of removing and replacing existing guardrail asphalt pads and asphalt flumes along various roadways in Holmes, Walton, and a portion of Washington Counties. Shoulder rework and sodding may be necessary at each location. Fertilization will be required on all locations where shoulder rework activities are performed. Removal and replacement of guardrail may be necessary to accomplish work. All guardrail to be replaced at end of each workday. Mobilization, Maintenance of Traffic, and removal & replacement of guardrail shall be incidental to the pay items listed. Section 0001 Asphalt Repair (Manual) (Tn) 0104- 10- 3 Sediment Barrier Lf 500.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 100.000 0339- 1- Miscellaneous Asphalt Pavement Tn 200.000 e110- 70- Removal Of Flexible Pavement Sy 1,000.000 e570- 5- Fertilizer Tn 1.000 e570- 9- 1 Water For Grass & Plants Mg 5.000 e575- 1- Sodding Sy 1,000.000 e577- 70- Shoulder Rework Sy 1,000.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents