Similar Projects
Watershed Dam Primary Spillway Renovation Slip Lining
New Construction
Post-Bid
$500,000 to $749,999 est. value
VA

Construction of the New General Assembly Building - Capitol Tunnel
New Construction - 6,000 SF
Post-Bid
$25,000,000 est. value
Richmond, VA 23219

Gunston Corner at Laurel Hill
Results
$3,895,000 est. value
Fairfax, VA

On-Call Dam Maintenance Services
Term Contract
Results
Charlottesville, VA 22902

Design-Build Tunnel System Project - River Renew Super Structure
Construction
$300,000,000 est. value
Alexandria, VA 22314

Clydes Dale Mobile Community - Dam Repairs
Renovation
Construction
Windsor, VA 23487

Clifford D. Craig Memorial Dam Drain Drilling and Exploration (Spring Hollow Drain Drilling)
Post-Bid
Roanoke, VA

Tunnel Cleaning Services
Term Contract
Results

Harwood’s Mill Dam Improvement Project
New Construction
Post-Bid
Newport News, VA

Burruss Hall Tunnel Top Repair
Results
Blacksburg, VA

Bland Boulevard Bridge Deck Expansion Dam Repairs - Structure No. 121- 8017
Results
Newport News, VA

Graham Creek Dam #1 Improvements
Results
$78,000 est. value
Madison Heights, VA 24572

Installation of Three (3) Flood Water Remote Monitoring Stations On Two (2) Flood Control Dams and One (1) Flood Control Dam
Results
Culpeper, VA 22701

Annual Maintenance the Hidden Lake Community and Dam
Term Contract
Results
VA

Sugar Hollow Dam - Rubber Dam Replacement
Results
Charlottesville, VA

Last Updated 08/23/2021 11:45 AM
Project Title

Annual Maintenance of the Hidden Lake Community and Dam for the Hidden Lake Service District

Physical Address View project details and contacts
City, State (County) VA   (Stafford County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Provide road maintenance within the Hidden Lake subdivision and at the Hidden Lake Dam, to include purchase and installation of appropriate stone (size 21A and 3, depending on area) culvert cleaning, repair and installation, grading and ditch maintenance on an as-needed basis to maintain acceptable conditions of road and shoulder. 2. Provide road maintenance of 3.5 miles (18,840 feet) gravel and 3/8 miles (1,980 feet) asphalt within the Hidden Lake subdivision and at the Hidden Lake Dam, to include snow removal/plowing and purchase of and the application of sand (or other suitable material) on an as-needed basis to maintain acceptable conditions of road and shoulder. 3. Provide road maintenance within Hidden Lake subdivision and at the Hidden Lake Dam to include repair of broken and/or failing areas of asphalt on an asneeded basis to maintain acceptable condition of road and shoulder. 4. Provide maintenance within the Hidden Lake subdivision, and at Hidden Lake and Hidden Lake Dam to include removal of trash, litter, debris, vegetation or any other material that could be considered a nuisance for the proper operation of the dam and community. Maintenance to be performed on an as-needed basis. 5. Provide maintenance within Hidden Lake subdivision, and at Hidden Lake and Hidden Lake Dam to include application of herbicide (or other suitable material) to prevent vegetative growth in areas that may be considered problematic for proper dam functions and operation. Grass cutting and weed eating for dam and other areas are to be performed on an as-needed basis.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents