Similar Projects
Rosslyn Tunnel Rehabilitation
Renovation
Bidding
$29,483,000 est. value
Arlington, VA 22202

Watershed Dam Primary Spillway Renovation Slip Lining
New Construction
Post-Bid
$500,000 to $749,999 est. value
VA

Clifford D. Craig Memorial Dam Drain Drilling and Exploration (Spring Hollow Drain Drilling)
Post-Bid
Roanoke, VA

Ivy Material Utilization Center Irrigation Pond Dam Alterations
Results
Charlottesville, VA 22900

Kennedy Dam Renovations
Renovation
Results
Less than $789,000 est. value
VA

Design-Build Tunnel System Project - River Renew Super Structure
Construction
$300,000,000 est. value
Alexandria, VA 22314

Clydes Dale Mobile Community - Dam Repairs
Renovation
Construction
Windsor, VA 23487

Lake Accotink Dam Stream Crossing
New Construction
Post-Bid
$1,200,000 to $1,700,000 est. value
Springfield, VA 22150

Upper Occoquan Dam Elevator Modernization
Renovation
Results
VA 22125

Harwood’s Mill Dam Improvement Project
New Construction
Post-Bid
Newport News, VA

Dooms Crossing Dam Removal, Bank Stabilization and Site Access Project
Demolition
Results
Waynesboro, VA 22980

John H. Kerr Dam and Reservoir Right Wing Dike Toe Drain Replacements
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Boydton, VA 23917

Annual Maintenance of the Hidden Lake Community and Dam for the Hidden Lake Service District
Term Contract
Results
VA

HRHT Tunnel Drainage System Pumps
Infrastructure
Results
Hampton, VA 23663

Amherst County Dam Emergency Spillway Improvements (Dan E. French Reservoir at Graham Creek)
Renovation
Results
Less than $2,120,500 est. value
Amherst, VA

Reported 04/22/2022 04:43 PM
Project Title

Construction of the New General Assembly Building - Capitol Tunnel

Physical Address View project details and contacts
City, State (County) Richmond, VA 23219   (Richmond City County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method
Project Status Construction Nearing Completion, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the new General Assembly Building-Capitol Tunnel, a 610 foot long pedestrian tunnel located at the corner of 9th and Broad streets in downtown Richmond, connecting the new General Assembly Building to the existing Capitol Building.

Details

Dam/Tunnel, New Construction, 1 Dam/Tunnel, Approximately 6,000 SF New Construction.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Historic Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Exterior Stone Cladding.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Security Fire Extinguisher Cabinets, Fire Extinguishers.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Water Utilities, Sanitary Utility Sewerage Structures, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents