Similar Projects
Rosslyn Tunnel Rehabilitation
Renovation
Bidding
$29,483,000 est. value
Arlington, VA 22202

Western Hill Portals Project
Renovation
Bidding
$250,000 est. value
Coeburn, VA 24230

Watershed Dam Primary Spillway Renovation Slip Lining
New Construction
Post-Bid
$500,000 to $749,999 est. value
VA

Clifford D. Craig Memorial Dam Drain Drilling and Exploration (Spring Hollow Drain Drilling)
Post-Bid
Roanoke, VA

Ivy Material Utilization Center Irrigation Pond Dam Alterations
Results
Charlottesville, VA 22900

Kennedy Dam Renovations
Renovation
Results
Less than $789,000 est. value
VA

Design-Build Tunnel System Project - River Renew Super Structure
Construction
$300,000,000 est. value
Alexandria, VA 22314

Construction of the New General Assembly Building - Capitol Tunnel
New Construction - 6,000 SF
Construction
$25,000,000 est. value
Richmond, VA 23219

John H. Kerr Dam and Reservoir Right Wing Dike Toe Drain Replacements
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Boydton, VA 23917

Lake Accotink Dam Stream Crossing
New Construction
Results
$1,200,000 to $1,700,000 est. value
Springfield, VA 22150

Clydes Dale Mobile Community - Dam Repairs
Renovation
Construction
Windsor, VA 23487

Upper Occoquan Dam Elevator Modernization
Renovation
Results
VA 22125

Dooms Crossing Dam Removal, Bank Stabilization and Site Access Project
Demolition
Results
Waynesboro, VA 22980

Annual Maintenance of the Hidden Lake Community and Dam for the Hidden Lake Service District
Term Contract
Results
VA

HRHT Tunnel Drainage System Pumps
Infrastructure
Results
Hampton, VA 23663

Last Updated 05/27/2022 04:54 PM
Project Title

Harwood’s Mill Dam Improvement Project

Physical Address View project details and contacts
City, State (County) Newport News, VA (Newport News City, York Counties)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,750,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition of the existing spillway chute, outlet works, and settling basins and other structures associated with a decommissioned water treatment plant formerly located at the project site. The project also includes the construction of a new spillway floor slab, training walls, intake structure and flume, access bridge, concrete crest wall, and the rehabilitation of the existing spillway weir. All new concrete structures except the concrete crest wall along the crest of the embankment section will be supported on auger-cast piles installed using the displacement method. Some major features of work include erosion and sediment controls, cofferdam design and installation for diversion and control of reservoir discharges during construction, and dewatering of deep excavations. The Owner intends to award a single contract for all work required on the project.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents