Similar Projects
Last Updated | 05/27/2022 04:54 PM |
Project Title | Harwood’s Mill Dam Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Newport News, VA (Newport News City, York Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,750,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the demolition of the existing spillway chute, outlet works, and settling basins and other structures associated with a decommissioned water treatment plant formerly located at the project site. The project also includes the construction of a new spillway floor slab, training walls, intake structure and flume, access bridge, concrete crest wall, and the rehabilitation of the existing spillway weir. All new concrete structures except the concrete crest wall along the crest of the embankment section will be supported on auger-cast piles installed using the displacement method. Some major features of work include erosion and sediment controls, cofferdam design and installation for diversion and control of reservoir discharges during construction, and dewatering of deep excavations. The Owner intends to award a single contract for all work required on the project. |
||||||
Details | Dam/Tunnel, New Construction.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |