Similar Projects
Watershed Dam Primary Spillway Renovation Slip Lining
New Construction
Post-Bid
$500,000 to $749,999 est. value
VA

Construction of the New General Assembly Building - Capitol Tunnel
New Construction - 6,000 SF
Post-Bid
$25,000,000 est. value
Richmond, VA 23219

Old Turner Steam Tunnel Repair
Results
Blacksburg, VA

Ivy Material Utilization Center Irrigation Pond Dam Alterations
Results
Charlottesville, VA 22900

Design-Build Tunnel System Project - River Renew Super Structure
Construction
$300,000,000 est. value
Alexandria, VA 22314

Clydes Dale Mobile Community - Dam Repairs
Renovation
Construction
Windsor, VA 23487

Clifford D. Craig Memorial Dam Drain Drilling and Exploration (Spring Hollow Drain Drilling)
Post-Bid
Roanoke, VA

Kennedy Dam Renovations
Renovation
Results
Less than $789,000 est. value
VA

Lake Accotink Dam Stream Crossing
New Construction
Post-Bid
$1,200,000 to $1,700,000 est. value
Springfield, VA 22150

Upper Occoquan Dam Elevator Modernization
Renovation
Results
VA 22125

Harwood’s Mill Dam Improvement Project
New Construction
Post-Bid
Newport News, VA

Dooms Crossing Dam Removal, Bank Stabilization and Site Access Project
Demolition
Results
Waynesboro, VA 22980

Annual Maintenance of the Hidden Lake Community and Dam for the Hidden Lake Service District
Term Contract
Results
VA

HRHT Tunnel Drainage System Pumps
Infrastructure
Results
Hampton, VA 23663

Amherst County Dam Emergency Spillway Improvements (Dan E. French Reservoir at Graham Creek)
Renovation
Results
Less than $2,120,500 est. value
Amherst, VA

Reported 03/19/2022 12:00 AM
Project Title

John H. Kerr Dam and Reservoir Right Wing Dike Toe Drain Replacements

Physical Address View project details and contacts
City, State (County) Boydton, VA 23917   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking information regarding the capability and availability of qualified contractors to provide the John H. Kerr Dam and Reservoir Right Wing Dike Toe Drain Replacements: work consists of the installation of new drain systems and toe berm in two areas along the toe of the John H. Kerr Dam Right Wing Dike and abandonment and grouting of seven sections of existing CMP toe drainpipe the abandonment of five existing manholes and complete abandonment of six previously abandoned existing outfall pipes. The work also consists of the repair to one section of the toe drain outfall pipe that has punctured or severely deformed at the John H. Kerr Dam Right Wing Dike. The locations of the new toe drain system and the damaged section of toe drain outfall pipe are shown on the plans. The work also includes the clean out of the existing toe drain system, including existing pipe and manholes and the video inspection of the existing toe drain system. The work also requires the raising of the existing piezometers where shown on the plans. Services to be provided under this contract include procuring and furnishing all equipment, labor, materials, and supplies to accomplish the work

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents