Similar Projects
Rosslyn Tunnel Rehabilitation
Renovation
Bidding
$29,483,000 est. value
Arlington, VA 22202

Watershed Dam Primary Spillway Renovation Slip Lining
New Construction
Post-Bid
$500,000 to $749,999 est. value
VA

Clifford D. Craig Memorial Dam Drain Drilling and Exploration (Spring Hollow Drain Drilling)
Post-Bid
Roanoke, VA

Ivy Material Utilization Center Irrigation Pond Dam Alterations
Results
Charlottesville, VA 22900

Kennedy Dam Renovations
Renovation
Results
Less than $789,000 est. value
VA

Design-Build Tunnel System Project - River Renew Super Structure
Construction
$300,000,000 est. value
Alexandria, VA 22314

Construction of the New General Assembly Building - Capitol Tunnel
New Construction - 6,000 SF
Construction
$25,000,000 est. value
Richmond, VA 23219

Harwood’s Mill Dam Improvement Project
New Construction
Post-Bid
Newport News, VA

Upper Occoquan Dam Elevator Modernization
Renovation
Results
VA 22125

Clydes Dale Mobile Community - Dam Repairs
Renovation
Construction
Windsor, VA 23487

John H. Kerr Dam and Reservoir Right Wing Dike Toe Drain Replacements
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Boydton, VA 23917

Dooms Crossing Dam Removal, Bank Stabilization and Site Access Project
Demolition
Results
Waynesboro, VA 22980

Annual Maintenance of the Hidden Lake Community and Dam for the Hidden Lake Service District
Term Contract
Results
VA

HRHT Tunnel Drainage System Pumps
Infrastructure
Results
Hampton, VA 23663

Amherst County Dam Emergency Spillway Improvements (Dan E. French Reservoir at Graham Creek)
Renovation
Results
Less than $2,120,500 est. value
Amherst, VA

Last Updated 05/13/2022 08:01 AM
Project Title

Lake Accotink Dam Stream Crossing

Physical Address View project details and contacts
City, State (County) Springfield, VA 22150   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 to $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the Lake Accotink Dam Stream Crossing project shall include demolition, construct a poured in place concrete non-elevated and elevated walkway involving concrete caissons, retaining wall, and associated site work at Lake Accotink Park adjacent to the Lake Accotink spillway.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents