Similar Projects
Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

District Seven FCO Structures and Sidewalk Project
Post-Bid
Less than $261,000 est. value
Clearwater, FL 33760

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Sidewalk Hercules Avenue Phase II From Sherwood Street to Sunset Point Road
Results
Clearwater, FL 33756

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

62nd Avenue Sidewalk and Intersection Improvement Project
Results
Less than $1,753,002 est. value
Clearwater, FL 33755

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

FY 2020 – FY 2022 Countywide ADA, Sidewalk, Drainage, Roadway Improvements (Pid # 004184A)
Results
$14,254,223 est. value
Clearwater, FL 33755

St. Petersburg College Board of Trustees Clearwater Campus Parking Lot Repairs
Post-Bid
Clearwater, FL 33755

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

FY21-23 Sidewalk and Underdrain Replacement
Post-Bid
Less than $4,300,000 est. value
Pinellas Park, Saint Petersburg, Seminole, FL 33702

Sunset Point Sidewalk - Alternate 19 to Pinellas Trail PID 002926A
Results
Less than $581,812 est. value
Clearwater, FL 33755

Parking Lot and Site Lighting Renovations
Post-Bid
Largo, FL 33773

Last Updated 03/12/2020 05:53 AM
Project Title

Sidewalk

Physical Address View project details and contacts
City, State (County) FL   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,225,329
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of pedestrian features including sidewalk, driveway, curb and gutter, milling, resurfacing, overbuild, drainage, signing, pavement markings, lighting, mid-block crossing, and other incidental construction from Oscar Hill Road to Dixie Highway on SR 595 (ALT US 19/N Pinellas Avenue) in Pinellas County. Section 0001 Roadway 0101- 1- Mobilization (44144125201) Ls 1.000 0102- 1- Maintenance Of Traffic (44144125201) Ls 1.000 0102- 3- Commercial Material For Temporary Driveway Maintenance Cy 80.200 0102- 60- Work Zone Sign Ed 3,864.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 8,417.000 0102- 74- 7 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Lf 145.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 946.000 0104- 1- Artificial Coverings /Rolled Erosion Control Products Sy 64.000 0104- 10- 3 Sediment Barrier Lf 1,232.000 0104- 11- Floating Turbidity Barrier Lf 65.000 0104- 15- Soil Tracking Prevention Device Ea 2.000 0104- 18- Inlet Protection System Ea 9.000 0104- 19- Chemical Treatment- Powdered, For Erosion Control Sy 64.000 0107- 1- Litter Removal Ac 9.380 0107- 2- Mowing Ac 6.650 0110- 1- 1 Clearing & Grubbing (44144125201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 14.000 0110- 7- 1 Mailbox, f&i Single Ea 3.000 0120- 1- Regular Excavation Cy 882.500 0120- 6- Embankment Cy 1,170.300 0160- 4- Type b Stabilization Sy 694.000 0285-713- Optional Base, Base Group 13 Sy 694.000 0286- 1- Turnout Construction/Driveway Base- Optional Materials Sy 501.000 0327- 70- 2 Milling Exist Asph Pavt, 3 1/2" Avg Depth Sy 7,720.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic c Tn 839.800 0337- 7- 83 Asphalt Concrete Friction Course,Traffic c, Fc-12.5, Pg 76-22 Tn 664.500 0400- 1- 2 Concrete Class i, Endwalls Cy 2.600 0425- 1-351 Inlets, Curb, Type p-5, <10` Ea 3.000 0425- 1-451 Inlets, Curb, Type j-5, <10` Ea 1.000 0425- 1-541 Inlets, Dt Bot, Type d, <10` Ea 4.000 0425- 1-910 Inlets, Closed Flume Ea 14.000 0425- 5- 1 Manhole, Adjust, Utilities Ea 1.000 0425- 6- Valve Boxes, Adjust Ea 6.000 0430-174-118 Pipe Culvert, Optional Material, Round, 18"Sd Lf 69.000 0430-174-124 Pipe Culvert, Optional Material, Round, 24"Sd Lf 57.000 0430-174-224 Pipe Culvert, Optional Material, Other Shape - Ellip/Arch,24"Sd Lf 89.000 0430-175-118 Pipe Culvert,Optional Material,Round, 18"s/Cd Lf 150.000 0430-175-124 Pipe Culvert,Optional Material,Round, 24"s/Cd Lf 74.000 0430-175-218 Pipe Culvert,Optional Material,Other-Elip/Arch, 18"s/Cd Lf 299.000 0430-175-230 Pipe Culvert, Opt Material, Other Shape - Elip/Arch, 30"s/c Lf 53.000 0430-984-125 Mitered End Section, Optional Round, 18" Sd Ea 6.000 0430-984-129 Mitered End Section, Optional Round, 24" Sd Ea 3.000 0430-984-625 Mitered End Sect, Optional - Elliptical / Arch, 18" Sd Ea 1.000 0430-984-629 Mitered End Sect, Optional - Elliptical / Arch, 24" Sd Ea 2.000 0515- 1- 2 Pipe Handrail - Guiderail, Aluminum Lf 73.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 3,036.000 0520- 2- 2 Concrete Curb, Type b Lf 94.000 0520- 2- 4 Concrete Curb, Type d Lf 3.000 0520- 3- Valley Gutter- Concrete Lf 96.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 1,254.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 506.000 0522- 3- Bus Boarding Pad- Concrete Sy 107.000 0527- 2- Detectable Warnings Sf 242.000 0530- 3- 4 Riprap, Rubble, f&i, Ditch Lining Tn 9.200 0530- 74- Bedding Stone Tn 6.600 0570- 1- 2 Performance Turf, Sod Sy 6,426.000 0571- 1- 11 Plastic Erosion Mat, Turf Reinforced Mat, Type 1 Sy 3,129.000 0999- 25- Initial Contingency Amount, Do Not Bid (44144125201) Ls 1.000 Section 0002 Signing 0654- 2- 21 Rectangular Rapid Flashing Beacon, Furnish & Install- Solar Powered, Complete Sign Assembly- Single Direction As 4.000 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 16.000 0700- 1- 50 Single Post Sign, Relocate As 5.000 0700- 1- 60 Single Post Sign, Remove As 4.000 0700- 3-601 Sign Panel, Remove, Up To 12 Sf Ea 4.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 27.000 0710- 90- Painted Pavement Markings, Final Surface (44144125201) Ls 1.000 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 500.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 95.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 0.052 0711- 11-160 Thermoplastic, Standard, White, Message Or Symbol Ea 4.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 14.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 195.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6" Gm 0.082 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 497.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 6.000 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 0.866 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid,6 Gm 0.720 Section 0003 Lighting 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 70.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 60.000 0630- 2- 14 Conduit, Furnish & Install, Aboveground Lf 10.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 4.000 0639- 1-122 Electrical Power Service, f&i, Underground, Meter Purchased By Contractor As 1.000 0639- 2- 1 Electrical Service Wire, Furnish & Install Lf 30.000 0641- 2- 12 Prestressed Concrete Pole, f&i, Type p-Ii Service Pole Ea 1.000 0715- 1- 12 Lighting Conductors, f&i, Insulated, No.8 - 6 Lf 480.000 0715- 4- 11 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 30` Mounting Height Ea 2.000 0715- 7- 11 Load Center, f&i, Secondary Voltage Ea 1.000 0715-500- 1 Pole Cable Distribution System, Furnish And Install, Conventional Ea 2.000 Section 0004 Utilities 0400- 2- 12 Concrete, Class Ii, Trench Slab Cy 8.300 0999- 25- Initial Contingency Amount, Do Not Bid Ls 1.000 1050- 15-001 Utility Pipe, Adjust/Modify, 0 - 1.9" Lf 30.000 1050- 15-002 Utility Pipe, Adjust/Modify, 2 - 4.9" Lf 140.000 1050- 15-003 Utility Pipe, Adjust/Modify, 5 - 7.9" Lf 130.000 1050- 16-004 Utility Pipe,Remove & Dispose, 8-19.9" Lf 20.000 1050- 31-212 Utility Pipe- Poly Vinyl Chloride, Furnish & Install, Water/Sewer, 12" Lf 20.000 1055- 11-414 Utility Fittings, f&i, Di/Ci, Elbow, 8 - 19.9" Ea 4.000 1055- 11-444 Utility Fittings, f&i, Di/Ci, Union, 8 - 19.9" Ea 1.000 1080- 21-500 Utility Fixture, Valve/Meter Box, Adjust Ea 12.000 1080- 29-112 Utility Fixture, Mechanical Joint Restraint, Furnish & Install, 12" Ea 12.000 1644-700- Fire Hydrant, Adjust & Modify Ea 1.000 1644-800- Fire Hydrant, Relocate Ea 1.000

Details

Division 10 - Specialties, Signage.
Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Asphalt Curbs, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents