Similar Projects
Iona Drainage District Canal H-7 Drainage, Phase 2
Term Contract
Bidding
$400,000 est. value
Fort Myers, FL 33901

71st Drive Drainage Ditch Improvements
Infrastructure
Post-Bid
Live Oak, FL 32060

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Shingle Creek Shoal Removal
Results
Kissimmee, FL 34741

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

E Towles Road Drainage Outfall Project
Post-Bid
FL

Seven Dwarfs Lane and Princess Way Drainage Improvements
Results
Less than $204,106 est. value
Kissimmee, FL 34741

Civil/Site Construction Services
Post-Bid
FL

Drainage Improvements C-100 Canal Outfalls Retrofit Between SW 98 Ave. and SW 106 Ct.
Results
Less than $693,814 est. value
Miami, FL

Bay Drive Stormwater Improvements
Post-Bid
Pompano Beach, FL 33060

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida
Results
$15,000,000 to $25,000,000 est. value
Anna Maria, FL

Construction Services for 2020 Stormwater Improvements Project
Post-Bid
FL

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Results
Less than $3,000,000 est. value
West Palm Beach, FL 33401

Last Updated 04/25/2022 01:50 PM
Project Title

Dona Bay Surface Water Storage Facility - Phase 2

Physical Address View project details and contacts
City, State (County) FL   (Sarasota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,780,721
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To the existing lake berm and embankment to create 364-acres of storage area, emergency lake overflow, installation of 8,100 feet of 72-inch diameter pipe to convey stormwater from Salt Creek rehydration area into the new storage lake and accommodate the surrounding properties off-site drainage flows. The Project includes earthwork, pond excavation, installation of drainage structures, large diameter reinforced concrete pipe, lake berm grading and aquatic plantings.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents