Similar Projects
2021 Fabric-Formed Erosion Protection Project
Bidding
Pembroke Pines, FL 33027

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

45th Year CDBG Drainage Improvement Project
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Drainage
Results
Less than $250,000 est. value
FL

Transportation and Surface Drainage and Ongoing Rehabilitation Program
Results
$861,319 to $1,019,136 est. value
Southwest Ranches, FL 33332

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Bonaventure Boulevard and Fire Station 55 Drainage Improvement
Results
Weston, FL 33326

Dania Cove/Southwest 25th Terrace Drainage Improvements
Renovation
Post-Bid
Dania Beach, FL 33312

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

NE 27th Avenue Drainage Improvements
Post-Bid
Lighthouse Point, FL

Desilting
Results
Less than $350,000 est. value
FL

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

Oakhill Culvert Replacement
Results
Less than $200,000 est. value
Davie, FL 33314

Canal Bank Erosion Tubing
Term Contract
Results
Margate, FL 33063

Historic Miramar Drainage System Improvements Phase V
Results
$400,000 to $550,000 est. value
Miramar, FL 33025

Reported 02/05/2021 12:00 AM
Project Title

Monterra Lake Bank Stabilization

Physical Address View project details and contacts
City, State (County) Coral Springs, FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construct three (3) phases of shoreline stabilization for previously constructed lakes throughout the Monterra community (Lake Assessment Map in Exhibit A) in an effort to reduce shoreline erosion from seasonal water fluctuations and species activity. The design and approach must meet the design intent of the typical cross-section included as Exhibit B.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents