Similar Projects
2021 Fabric-Formed Erosion Protection Project
Bidding
Pembroke Pines, FL 33027

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Drainage
Results
Less than $250,000 est. value
FL

Transportation and Surface Drainage and Ongoing Rehabilitation Program
Results
$861,319 to $1,019,136 est. value
Southwest Ranches, FL 33332

45th Year CDBG Drainage Improvement Project
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Desilting
Results
Less than $350,000 est. value
FL

Dania Cove/Southwest 25th Terrace Drainage Improvements
Renovation
Post-Bid
Dania Beach, FL 33312

Oakhill Culvert Replacement
Results
Less than $200,000 est. value
Davie, FL 33314

NE 27th Avenue Drainage Improvements
Post-Bid
Lighthouse Point, FL

Canal Bank Erosion Tubing
Term Contract
Results
Margate, FL 33063

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

Historic Miramar Drainage System Improvements Phase V
Results
$400,000 to $550,000 est. value
Miramar, FL 33025

Last Updated 01/10/2020 11:13 AM
Project Title

Bonaventure Boulevard and Fire Station 55 Drainage Improvement

Physical Address View project details and contacts
City, State (County) Weston, FL 33326   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, supervision, materials, equipment, supplies, tools, safety measures, and maintenance of traffic required for Bonaventure Blvd & Fire Station 55 Drainage Improvement. The work includes, but is notlimited to, removal and disposal of existing structure, installation of 36” concrete precast structure, installation of frame and grate, installation of 15” corrugated aluminum pipe, replacing sidewalk, and restoration of landscaping

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents