Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Sunterra Lift Station No. 2
Alteration
Bidding
$911,000 est. value
TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Booster Pump Replacement
Results

Newport Pointe Lift Station Phase 1
Results
TX

1.40 MGD Wastewater Treatment Plant No. 2 Expansion and Lift Station
Addition
Bidding
Humble, TX 77396

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Existing Lift Station Nos. 2 and 3 Electrical Modifications, Generator, and Motor Control Center Replacement
Results
$300,000 est. value
Houston, TX 77040

SL0008 - Pump Station and Drainage System Cleaning
Infrastructure
Bidding
$296,433 est. value
TX

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Construction of Proposed Wastewater Lift Station No. 2 and 6" Force Main Serving Anderson Lake Development
Results
TX

Construction of Lift Station No. 1 - Phase 1
New Construction
Bidding
TX

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

Marvida Lift Station No. 1
Results
Less than $987,000 est. value
TX

Last Updated 02/18/2022 12:17 AM
Project Title

HPW - Westridge Regional Lift Station

Physical Address View project details and contacts
City, State (County) TX 77282   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $24,383,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Contract is for the construction of the Westridge Regional Lift Station and Force Main, construction of gravity sanitary sewer lines, installation and operation of diversion pumping, abandonment and demolition of three existing Lift Stations (Kirby No. 1, Westridge, and Main Street), and site restoration.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents