Similar Projects
Grande Esplanade
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
North Ridgeville, OH 44039

Roadway Minor Rehab
Infrastructure
Design
$1,487,000 CJ est. value
Elyria, OH 44035

Mechanic Street / Crook Street Improvements Phase 2 - Rebid
Infrastructure
Bidding
$1,618,000 CJ est. value
Grafton, OH 44044

Mechanic Street / Crook Street Improvements Phase 2 - Rebid
Infrastructure
Bidding
$1,618,000 CJ est. value
Grafton, OH 44044

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ Design - New Fire Station Facility
New Construction, Infrastructure - 12,000 SF
Post-Bid
$3,000,000 CJ est. value
Grafton, OH 44044

Nova 8 Inch Transmission Water Main Extension Contract 98
Infrastructure
Results
Lagrange, OH

Hampshire Farms - Underground Utilities
Infrastructure
Results
Amherst, OH

Sheffield Village Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Pending Verification
$24,340,000 CJ est. value
Sheffield Village, OH 44035

Noveon/Lubrizol Building Addition
Addition, Demolition, Infrastructure - 1,856 SF
Pending Verification
$1,000,000 CJ est. value
Avon Lake, OH 44012

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Campana Park Improvements Project
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Lorain, OH 44053

Avon Lake Regional Water Annual Water Distribution and Supplies Bid 2021-2022
Infrastructure
Post-Bid
Avon Lake, OH

Lead Service Line Replacements Phase 2
Infrastructure
Results
Elyria, OH

The LORCO - Cinnamon Lake Maintenance Building project
Demolition, New Construction, Infrastructure
Design
$3,327,000 CJ est. value
Wellington, OH 44090

Last Updated 10/07/2022 12:32 PM
Project Title

Eastview Avenue Sanitary Sewer Extension

Physical Address View project details and contacts
City, State (County) North Ridgeville, OH 44039   (Lorain County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All questions during bidding shall be emailed to bidinquiries@nridgeville.org. The work will consist of the installation of a new eight (8) inch sanitary sewer main going east from the intersection of Ridgeview Boulevard and Hadaway Street, then turning south through the right of way of Eastview Avenue and terminating north of Center Ridge Road. The total length of sanitary sewer main to be installed is approximately 800 linear feet. Ancillary improvements include the restoration of right of way amenities disturbed during construction. Provisions in the construction documents also provide sanitary laterals with cleanouts to property owners along the sanitary extension for future abandonment of septic systems. Each proposal shall be accompanied by a bid guarantee which shall consist of an Ohio Statutory Bid Guaranty and Contract Bond, substantially in the form prescribed by ORC 153.57 in a penal amount equal to or greater than 100% of the bid price. No other form of bond is acceptable. Bid security furnished in bond form shall be issued by a surety Company or Corporation licensed in the State of Ohio to provide said surety. The City of North Ridgeville, Ohio reserves the right to reject any or all Bids and to waive any irregularities in bidding. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. Each proposal must contain labels that identify the bid form and the insurance bid bond information. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the Equal Employment Opportunity requirements of Ohio Administrative Code, Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9, shall be required. Bidders must comply with the prevailing wage rates on Public Improvements in Lorain County and the City of North Ridgeville, Ohio, as determined by the Department of Commerce, Division of Labor and Worker Safety, Bureau of Wage and Hour.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents