Similar Projects
Reported | 06/23/2022 03:44 PM |
Project Title | St. Benedict Episcopal School Middle School Classroom Building |
Physical Address | View project details and contacts |
City, State (County) | Smyrna, GA 30080 (Cobb County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Bids by Invitation. |
Project Status | Schematic Drawings, Construction Start Expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $7,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design plans call for the construction of a 50,000-square-foot, 64-space educational facility. Location: 2001 Daniel Street, 2235 Cooper Lake Road Plans call for the construction of a middle school classroom building, library, music building, and gymnasium with a plaza and central lawn areas for outdoor gatherings as well as recreational areas, and parking. The school’s intention is to move grades 5-8 from the existing south campus on Weaver Street at which point the Pre-K program will be moved there from the main campus on Cooper Lake Road. The maximum student population for the middle school is anticipated to be 350. On June 21, 2022, the Cobb County Board of Commission Zoning Meeting made a motion that the zoning application and an associated Special Land Use Permit (SLUP) be held for 60 days, pending completion of the traffic study analysis by the Cobb DOT, and with a requirement that the applicant hold a community meeting with neighbors from the surrounding neighborhoods.. An architect has been selected. Information regarding the selection of a general contractor has not been disclosed. A firm construction timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, 50,000 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |