Similar Projects
Campground Development - 459-054 - City of Sioux City
Infrastructure
Conception
$2,550,000 CJ est. value
Sioux City, IA 51101

Campground Development - 459-054 - City of Sioux City
Infrastructure
Conception
$2,550,000 CJ est. value
Sioux City, IA 51101

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

Construction of the Hamilton Boulevard Resurfacing Project 36th Street to City Limits Street
Infrastructure
Bidding
$1,235,000 CJ est. value
Sioux City, IA 51104

Construction of the Hamilton Boulevard Resurfacing Project 36th Street to City Limits Street
Infrastructure
Bidding
$1,235,000 CJ est. value
Sioux City, IA 51104

Fire Hydrant Cleaning/Painting Project
Infrastructure, Alteration
Post-Bid
Sioux City, IA

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Post-Bid
$6,150,000 CJ est. value
Sioux City, IA 51104

PCC Pavement - Grade and Replace
Infrastructure
Results
Sioux City, IA

HMA Resurfacing with Milling
Infrastructure
Results
Sioux City, IA

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Moville Area Medical Clinic
New Construction, Infrastructure - 10,000 SF
Pending Verification
$5,900,000 CJ est. value
Moville, IA 51039

Leeds Connector - 459-320 - City of Sioux City
Infrastructure
Conception
$250,000 CJ est. value
Sioux City, IA 51101

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
$2,000,000 CJ est. value
Sioux City, IA 51101

Moville 2nd Street Overlay
Infrastructure
Post-Bid
$350,000 est. value
Moville, IA 51039

Last Updated 06/15/2023 09:50 AM
Project Title

Thompson Park Improvements Project

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51101   (Woodbury County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $644,458 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded to KP Construction Inc. in the amount of $644,457.50. The project is located at 803 14th Street and 1400 Ingleside Avenue and includes limited demolition, earthwork, utilities, installation of PCC paving, installation of playground structures and safety play surfacing, decorative fencing, water service, drinking fountain installation, open shelter structure, erosion control, temporary traffic control, pavement markings, signage and miscellaneous associated work necessary to complete the project. Est. Completion Date: June 1, 2023

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents