Similar Projects
Last Updated | 08/26/2022 10:04 AM |
Project Title | Conduit Install Directional Boring - Viewmont Avenue |
Physical Address | View project details and contacts |
City, State (County) | Springfield, OR 97477 (Lane County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Springfield Utility Board (SUB) seeks a contractor to install underground facilities consisting of one (1) threeinch (3") conduit for new underground electric distribution cable for the entire length of the project and two (2) two-inch (2") conduits for a section of the project. The work will consist of directional boring and trenching at 2686 & 2667 Viewmont Avenue and a vault installation at 2667 Viewmont Avenue. Trench approximately 40 feet of one (1) two-inch (2") conduit between junction box at 2686 Viewmont Avenue and meterbase at 2686 Viewmont Avenue. Bore approximately 50 feet of one (1) three-inch (3") conduit between junction box at 2686 Viewmont Avenue and junction box at 2580 Viewmont Avenue. Sweep up at each junction box. Trench approximately 20 feet of two (2) three-inch (3") conduit from junction box at 2686 Viewmont Avenue Southeast to road crossing across from new vault 22A016 location. Cap and mark one (1) conduit. Sweep one (1) conduit under water and gas line to connect to old vault 94N108. Bore approximately 50 feet of two (2) three-inch (3") conduits across Viewmont Avenue. Sweep one (1) conduit into old vault 94N108. Install one (1) conduit directly into new vault 22A016 and extend this conduit at 2686 Viewmont Avenue past the gas and water line then cap and mark. Install new 4'x 4' Vault # 22A016 at 2667 Viewmont Avenue. Trench approximately 5 feet of one (1) three-inch (3") conduit between new vault 22A016 and old vault 94N108. Bore approximately 40 feet of one (1) two-inch (2") conduit from new vault 22A016 to the Northeast corner of 2629 Viewmont Avenue. Sweep up within two feet (2') from front of garage. Bore approximately 40 feet of one (1) two-inch (2") conduit from new vault 22A016 to the Northwest corner of 2667 Viewmont Avenue. Sweep up near existing meter base. Bore approximately 80 feet of one (1) three-inch (3") conduit between new vault 22A016 and junction box at 2581 Viewmont Avenue. Sweep up at junction box. Bore approximately 80 feet of one (1) three-inch conduit between new vault 22A016 and junction box at 2673 Viewmont Avenue. Sweep up at junction box. Conduits are to be installed per SUB specifications. Contractor shall restore any disturbed landscaping and asphalt/concrete to original condition or better. Contractor is responsible for requesting underground utility locates, private locates and is responsible for pot holing as necessary. Contractor Shall Supply 3" conduit, PVC schedule 40, Gray 2" conduit, PVC schedule 40, Gray 3" Poly, 3" nominal size, (HDPE), SDR 13.5, ATSM F2160, Gray 2" Poly, 2" nominal size, (HDPE), SDR 13.5, ATSM F2160, Gray 3" PVC-POLY Coupler, Dura-Line 3" SHUR-LOCK II, 20000173 2" PVC-POLY Coupler, Dura-Line 2" SHUR-LOCK II, 20000123 3" 90 degree sweeps, 36" radius - PVC schedule 40, Gray 3" 45 degree sweeps, 36" radius - PVC schedule 40, Gray 2" 90 degree sweeps, 36" radius - PVC schedule 40, Gray 2" 45 degree sweeps, 36" radius - PVC schedule 40, Gray 1,250 lb. rated mule tape End Bells - PVC schedule 40, Gray Glue for conduit and pipe Fill dirt and mulch if needed Asphalt repair as needed Landscape restoration Working hours are to be Monday-Friday, 7:00 a.m. to 4:30 p.m., no holidays or weekends. Work to be completed by October 5th, 2022 or sooner. If this completion date could not be met, please provide a proposed completion date on bid form. Project Point of Contact: Dan Norland, 541-744-3784 Cell, 541-735-0377 Office dann@subutil.com Bid Questions: Sandi Weston, 541-744-3706 Office, sandiw@subutil.com |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |