Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

AutoZone #3000 / Phoenix
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Phoenix, AZ 85254

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Construction Administration TT0342, McKellips Road SR 101 to Alma School Road
Results
Phoenix, AZ 85009

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Greenbelt 88 - Lucky Plaza
New Construction, Infrastructure - 22,000 SF
Pending Verification
$115,000,000 CJ est. value
Scottsdale, AZ 85251

RFP - Development of P83 Central Business District
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Peoria, AZ 85345

Last Updated 08/18/2022 08:04 AM
Project Title

Carefree Highway between Cave Creek Road to Scottsdale Road - City of Scottsdale

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ 85262   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $10,885,900 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 18, 2022, an engineer has been selected for the project. Per the owner, bidding is estimated for 2024. *The closed solicitation has been included below for reference: The project will widen Carefree Highway between Scottsdale Road and Cave Creek Road to a 4-lane arterial complete street. Project features will include a raised landscaped median, increased travel lane capacity, safety improvements at critical intersections, and a new shared-use path/trail at the south side. Non-motorized improvements on the north side will be determined by the Town of Carefree. In addition, the project will consider a roundabout at 60th St. The project limits are Cave Creek Rd to Scottsdale Rd, the project length is 1.8 miles. In some locations, right of way will need to be purchased. The project will also investigate if noise mitigation measures are considered necessary during the design phase. Roadway 10-foot wide multi use path & 8-foot wide trail on south side of roadway Landscaped median Drainage improvements including box culverts / bridges. Fiber Optic/ITS Estimated Impact: $934,328 Consistent with recent the City s Transportation Master Plan, this project will construct the section of Carefree Highway between Scottsdale Road and Cave Creek Road to minor arterial cross Section. The project is part of the Regional Transportation Plan. Funding is included in the Arterial Life Cycle Program (ALCP) in Fiscal Years 21-23. The regional funding is currently provided by the Regional Area Road Fund (0.5% sales tax). However, the construction portion of the project in FY 24-25 may be converted to federal Surface Transportation Program funding. All design documents must be prepared following current City of Scottsdale s Design Standards & Policies Manual. Design documents must also need to meet federal standards if federal funds are utilized by the city in this project. Questions due1:00 p.m. Friday December 3, 2021 SOQs due1:00 p.m. Friday December 17, 2021 Anticipated Interviews Week of January 4, 2021 Anticipated Selection Week of January 4, 2021 Anticipated Council Award February 2022 . The City of Scottsdale reserves the right to reject any oral Statements of Qualifications, to waive any informality or irregularity in any Request for Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. The method of contractor selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents