Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Mission Ridge Resort Expansion
New Construction
Conception
Wenatchee, WA 98801

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

SR 971/Navarre Coulee Site 5 - Rock Slope Scaling
Infrastructure
Design
$300,000 CJ est. value
Chelan, WA 98816

US 2 and US 97 Leavenworth & N of Blewett Pass Paving
Infrastructure
Bidding
$12,500,000 CJ est. value
Leavenworth, WA 98826

US 2 and US 97 Leavenworth & N of Blewett Pass Paving
Infrastructure
Bidding
$12,500,000 CJ est. value
Leavenworth, WA 98826

WDFW - Roses Lake Access Redevelopment Phase Two Rebid - Manson
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

Call for Artists Highway Two Easy Street Roundabout
Infrastructure
Post-Bid
$175,000 to $200,000 est. value
Wenatchee, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Chelan County Public Utility District Service Center Project - Bid Package 08.20
New Construction, Infrastructure
Construction
$105,000,000 CJ est. value
Wenatchee, WA 98801

Springhill Reservoir Embankment Improvements - Rebid
Infrastructure
Construction
$82,624 CJ est. value
Wenatchee, WA 98801

Regional Aquatic Center / Wenatchee Landing - City of Wenatchee
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Wenatchee, WA 98801

Sanders Street Crosswalks & Bulbouts Construct - City of Chelan
Infrastructure
Conception
$700,000 CJ est. value
Chelan, WA 98816

US 12/Ackley Rd/Clover Lane - Intersection Safety Improvements
Infrastructure
Design
$1,008,000 CJ est. value
Leavenworth, WA 98826

Last Updated 02/20/2023 07:33 AM
Project Title

US 97A/Chelan Vicinity - Curb Ramp Upgrades

Physical Address View project details and contacts
City, State (County) Leavenworth, WA 98826   (Chelan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2025
Bids Due View project details and contacts
Estimated Value $1,332,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 209793L This project reconstructs curb ramps to comply with current ADA standards. As of February 20, 2023, this project is in a Design status. Preliminary engineering has begun and environmental design completed in the third quarter of 2025. The contract advertisement is expected in fourth quarter 2025 and construction is anticipated to be operationally complete in the fourth quarter of 2026. WSDOT - US 97A/Chelan Vicinity - Curb Ramp Upgrades *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents