Similar Projects
US 2 Et Al NCR Guardrail Update 21-23
Infrastructure
Design
$6,321,000 est. value
Leavenworth, WA 98826

US 97A/S of Entiat - Site 2 - Rock Slope Scaling
Infrastructure
Design
$394,000 CJ est. value
Entiat, WA 98822

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Walla Walla Point Park Pedestrian Bridge Abutment Repairs
Infrastructure
Results
$73,000 CJ est. value
Wenatchee, WA 98801

Walla Walla Point Park Pedestrian Bridge Abutment Repairs
Infrastructure
Results
$73,000 CJ est. value
Wenatchee, WA 98801

New Fire Station At Sun Cove
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Entiat, WA 98822

Fire Protection System Upgrades and Miscellaneous Piping at the Wells Hydroelectric Project
Infrastructure
Bidding
$3,935,750 CJ est. value
Wenatchee, WA 98801

Kenzie's Landing
New Construction, Infrastructure
Post-Bid
$1,000,000 est. value
Wenatchee, WA

Wenatchee City Pool Liner and Plumbing Upgrade Re-bid
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Wenatchee, WA 98801

Kenzies Landing Trailhead Access Road Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Wenatchee, WA 98801

Springhill Reservoir Embankment Improvements - Rebid
Infrastructure
Post-Bid
$85,000 CJ est. value
Wenatchee, WA 98801

Last Updated 09/20/2022 07:37 AM
Project Title

SR 971/Navarre Coulee Site 5 - Rock Slope Scaling

Physical Address View project details and contacts
City, State (County) Chelan, WA 98816   (Chelan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This slope has a history of falling rocks. Strategic scaling of loose rock and debris removal will increase highway safety and slope stability. As of September 20, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the Third quarter of 2022. The contract advertisement is expected in fourth quarter of 2022 and construction is anticipated to be operationally complete in the third quarter of 2023. WSDOT - SR 971/Navarre Coulee Site 5 - Rock Slope Scaling *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents