Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

SR 971/Navarre Coulee Site 5 - Rock Slope Scaling
Infrastructure
Design
$300,000 CJ est. value
Chelan, WA 98816

CTC Salvage, Demolition and Restoration
Demolition, Renovation, Infrastructure - 91,023 SF
Bidding
$2,600,000 CJ est. value
Wenatchee, WA 98801

Big Meadow Creek Bridge
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Leavenworth, WA 98826

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Lakeshore Reservoir Rehabilitation
Renovation
Results
$550,000 est. value
Manson, WA 98831

Fire Protection System Upgrades and Miscellaneous Piping at the Wells Hydroelectric Project
Infrastructure
Results
$3,968,490 CJ est. value
Wenatchee, WA 98801

Chelan County Public Utility District Service Center Project - Bid Package 08.20
New Construction, Infrastructure
Construction
$105,000,000 CJ est. value
Wenatchee, WA 98801

US 12/Ackley Rd/Clover Lane - Intersection Safety Improvements
Infrastructure
Design
$1,008,000 CJ est. value
Leavenworth, WA 98826

Kenzie's Landing
New Construction, Infrastructure
Post-Bid
$1,000,000 est. value
Wenatchee, WA

US 97A/Dan Gordon Bridge - Approach Slab Repair
Infrastructure, Renovation
Design
$922,000 CJ est. value
Leavenworth, WA 98826

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Kirkland, WA 98033

US 97A/Chelan Vicinity - Curb Ramp Upgrades
Infrastructure
Design
$1,332,000 CJ est. value
Leavenworth, WA 98826

Last Updated 10/27/2022 10:35 AM
Project Title

Springhill Reservoir Embankment Improvements - Rebid

Physical Address View project details and contacts
City, State (County) Wenatchee, WA 98801   (Chelan County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $82,624 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Dams/Reservoirs, Excavation, Grade and Surface, Concrete/Formed/Flatwork/Foundation The major item include excavation, embankment compaction, rock for scour protection, and concrete spillway improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents