Similar Projects
Last Updated | 08/16/2022 08:32 AM |
Project Title | Stehekin Fire Fighting Facilities Development Project |
Physical Address | View project details and contacts |
City, State (County) | Stehekin, WA 98852 (Chelan County) |
Category(s) | Government/Public, Heavy and Highway, Residential, Sewer and Water |
Sub-Category(s) | Fire/Police Station, Lift and Pump Stations, Single-Family Homes, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | NOCA 259864 (Utilities), NOCA 205601 (Fire Cache), NOCA 156830 (Dormitory) a) This acquisition is being conducted as a full and open solicitation. The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in clause 52.204-8 in section "K" of this solicitation. b) Estimated Price Range: More than $10,000,000 c) Refer to section "L" for information regarding a pre-proposal site visit. d) Information and requirements stated in sections "B" through "J" & attachments noted in section "J" apply to this solicitation and the subsequent contract. e) Refer to section "L" for proposal submittal requirements. f) This is currently an unfunded requirement with a high expectation that funds will be available. When and if funds become available a contract will be awarded at that time. g) Offerors shall submit proposals and questions, and acknowledge solicitation amendments as stated in section "L" of this solicitation The work of this contract is to construct a fire cache to help battle any future forest fires in the area. Project Location: The project is located at North Cascades National Park Service Complex 4.5 miles from Stehekin, WA. There are three different parts to this project, Utilities, Fire Cache and Dormitory. The Utilities scope of work includes extending power distribution (electrical service) lines to the firefighting facilities, providing a new water storage tank, rehabilitation of an existing groundwater well, new water distribution for both fire suppression and domestic and water service lines, and an installing new septic system sized for the treatment of wastewater produced by the fire cache and dorm facilities. The Fire Cache scope of work includes the construction of a new Fire Station-Cache-Operations building approximately 3,019 square foot in size. The Fire Dormitory scope of work includes construction of a new dormitory approximately 3,705 square foot in size and co-located with the Fire Cache. The dormitory will house 8 to 16 personnel in eight (8) bedrooms, with ability to house up to 20 personnel on a short-term basis. Pre-proposal questions shall be submitted a minimum of 7 days prior to the due date and time for proposals. Submit questions only though email to both of the following: Contracting Officer, Natasha DiPietro, natasha_dipietro@nps.gov Contract Specialist, Seth Mercil, seth_mercil@nps.gov |
||||||||||||||||||||||||||||||||||||||||||||||||
Details | ,, 6,724 SF - 3,019 SF. 3,705 SF Rooms, 8 Unit(s).
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |